Tile Setter (Tiler) Resume Examples & Writing Guide
A tile setter resume gets a call when the contractor can see, in a few seconds, what you have set (porcelain, large format, natural stone, mosaics), where (showers, commercial lobbies, hospitals), how fast and how clean (square feet a day, zero callbacks, waste under 10%), and whether you know the systems: waterproofing membranes, uncoupling mats, mud beds, ANSI and TCNA methods. One page, no photo.
Tile setter resume example (10 years, commercial and residential)
In the US the job is called tile setter or tile installer; in the UK, Ireland and Australia it is a tiler or wall and floor tiler. Use the word the posting uses. This resume is for a lead setter at a mid-size tile contractor in Colorado who came up through an apprenticeship. Name and companies are made up. The numbers are the kind a foreman tracks on the daily log: square feet set, jobs completed, callbacks.
Tomas Villanueva
Lead Tile Setter (CTI Certified)
Denver, CO · (720) 555-0158 · tomas.villanueva.tile@email.com · CTEF Certified Tile Installer #(on request) · OSHA 30
Summary
Tile setter with 10 years on commercial and high-end residential work, the last 5 as lead setter running crews of 3 to 5 on hospital, hotel and custom-home projects. CTEF Certified Tile Installer with ACT certifications in large format tile and shower receptors. Sets 180 to 220 square feet of 12x24 porcelain a day to ANSI A108 flatness and lippage tolerances, with zero warranty callbacks on 60+ shower installations since 2021.
Experience
Lead Tile Setter · Front Range Tile & Stone (commercial and residential tile contractor, 25 installers), Denver, CO
Apr 2021 – Present
- Lead a crew of 3 to 5 setters and helpers on projects from 800 to 14,000 square feet: hospital corridors, hotel bathrooms (120 rooms), restaurant kitchens and custom homes.
- Set 180 to 220 square feet a day of 12x24 and 24x48 porcelain using a leveling clip system and 1/2-inch notched trowel with back-buttering; lippage held within the ANSI A108.02 tolerance on every inspected job.
- Built 60+ curbless and curbed showers with bonded waterproofing membranes (Schluter Kerdi, RedGard) and flood-tested every pan for 24 hours before tile; zero leaks or warranty callbacks to date.
- Installed about 9,000 square feet of uncoupling membrane (DITRA) and 2,400 square feet of electric floor-heat mat across 2025 projects, all passing the electrician's resistance check.
- Read architectural drawings and finish schedules, lay out patterns (running bond, herringbone, 1/3 offset) from control lines, and keep material waste under 8% on straight-lay and under 15% on diagonal and mosaic work.
- Completed 11 of 12 scheduled projects in 2025 on or ahead of the tile milestone, and hold the crew's daily silica-control and housekeeping checklist under the company's OSHA program.
Tile Setter (apprentice 2016 to 2019, journeyman 2019 to 2021) · Summit Flooring Company (flooring contractor, residential and light commercial), Aurora, CO
May 2016 – Mar 2021
- Completed a 3-year tile setter apprenticeship (6,000 hours) covering substrate prep, mud beds, backer board, thinset and epoxy grouts, natural stone and glass mosaics.
- Set about 130,000 square feet of floor and wall tile over 5 years across roughly 350 residential bathrooms and kitchens and 20 retail stores.
- Prepared substrates: self-leveling underlayment over 40+ slabs, cement backer board on wood-framed floors, crack isolation membrane on slab cracks, and moisture checks before each install.
- Cut porcelain, marble and travertine on a 10-inch wet saw and with an angle grinder for outlets, niches and curves, with less than 2 damaged pieces per 100 cuts.
- Trained 4 new helpers on mixing ratios, coverage checks and grout timing; none of their jobs required rework.
Education
Tile Setter Apprenticeship, 3 years (6,000 hours)
Summit Flooring Company, with classroom training through a Denver-area trades program, 2019
High School Diploma
Aurora Central High School, Aurora, CO, 2015
Certifications
- CTEF Certified Tile Installer (CTI), 2020
- Advanced Certifications for Tile Installers (ACT): Large Format Tile and Substrate Preparation; Shower Receptors (2022)
- OSHA 30-Hour Construction (2021)
- OSHA Respirable Crystalline Silica awareness training (2023)
Skills
What tile contractors and general contractors check first
The reader is usually the owner of a tile company or a flooring contractor's field superintendent. They are hiring against a schedule and a warranty, and they read a setter's resume for four things.
- What have you actually set, and where? Residential bathrooms only, or commercial floors with a 14,000-square-foot lobby? Large format and thin panels are a different skill from 12x12 ceramic. Natural stone and glass mosaics need their own care. Name the tile types and the settings.
- Do you know wet areas? Showers are where callbacks and lawsuits come from. Membranes (Kerdi, RedGard, Hydro Ban), mud beds, pre-slope, flood testing, linear drains. One bullet with a shower count and "zero leaks" answers the biggest fear a contractor has.
- Speed and waste. Square feet a day on a stated tile size, and waste percentage on cuts. A setter who is accurate about pace is easier to schedule than one who claims to be the fastest in the state.
- Standards and safety. ANSI A108 for installation, TCNA Handbook methods, OSHA 10 or 30, silica controls. Contractors on commercial jobs cannot put you on site without the safety card, and inspectors will check the flatness and lippage.
“Everyone writes 'experienced in all types of tile'. I want to know how many showers you have waterproofed, whether you flood test, and what your day looks like in square feet on 24x48 porcelain. That tells me if you can run a bathroom on a hotel job or if someone has to babysit you.”
Tile setter job description for a resume: duties turned into bullets
The job description in a posting says "install ceramic, porcelain and stone tile on floors and walls". Copying it back proves nothing. Rewrite each duty with the material, the method and a number. Seven rewrites from real tile work:
| Weak (copied from the posting) | Strong (material, method, number) |
|---|---|
| Installed ceramic and porcelain tile on floors and walls. | Set 180 to 220 square feet a day of 12x24 porcelain floor tile with a leveling clip system, holding lippage inside the ANSI A108.02 tolerance on every inspected job. |
| Waterproofed showers. | Built 60+ showers with bonded membranes and pre-sloped pans, flood-tested each for 24 hours before tile; zero leaks or warranty callbacks since 2021. |
| Prepared surfaces before tiling. | Poured self-leveling underlayment over 40+ out-of-flat slabs and installed cement backer board and crack-isolation membrane on wood-framed floors, checking flatness to 1/8 inch in 10 feet before setting. |
| Cut tile to fit around fixtures. | Cut porcelain, marble and travertine on a 10-inch wet saw and angle grinder for niches, outlets and curves with fewer than 2 damaged pieces per 100 cuts. |
| Laid out tile patterns. | Laid out herringbone, 1/3 offset and running bond patterns from control lines on projects up to 14,000 square feet, keeping cut waste under 8% on straight lay and under 15% on diagonals. |
| Mixed and applied thinset and grout. | Selected and mixed modified, unmodified and large-and-heavy-tile mortars to manufacturer ratios; installed epoxy grout in 20 commercial kitchens with no staining or failure complaints. |
| Supervised helpers. | Led a crew of 3 to 5 setters and helpers, kept the daily log and material takeoffs, and finished 11 of 12 projects in 2025 on or ahead of the tile milestone. |
Start with an example, finish in minutes.
No sign-up to start. Download works. One-time $12 for a clean PDF, no subscription.
Tiling skills for a resume: materials, systems, tools
Tile contractors read the skills list looking for product names and methods they use themselves. Group the list by type and use the real names; "waterproofing" alone is vague, "Kerdi and RedGard bonded membranes, flood tested" is not.
- Tile and stone: porcelain, ceramic, large format (24x48 and up), thin porcelain panels, marble, travertine, slate, quarry tile, glass and stone mosaics, subway and handmade tile with irregular edges.
- Wet-area systems: bonded sheet and liquid membranes (Schluter Kerdi, Laticrete Hydro Ban, Custom RedGard), mud-bed and pre-formed shower pans, curbless showers, linear drains, steam showers, flood testing.
- Substrates and prep: self-leveling underlayment, cement backer board, uncoupling membranes (DITRA), crack isolation, sound mats, electric floor heat, moisture and flatness testing.
- Mortars and grouts: modified and unmodified thinset, large-and-heavy-tile mortar, medium bed, epoxy, cement and pre-mixed grouts, sealers, movement joints.
- Layout and standards: control lines, laser level, pattern layout, finish schedules and drawings, ANSI A108/A118 and TCNA Handbook methods, lippage and coverage checks.
- Tools: wet saw, snap cutter, angle grinder, hole saws and core bits, mixing drill, leveling clip systems, trowels, grout floats, HEPA vacuum and wet-cutting dust controls.
- Job skills: material takeoffs, daily logs, working with plumbers and electricians, punch-list completion, customer walk-throughs on residential jobs.
Large format porcelain (24x48) · thin panels · leveling systems · epoxy grout · DITRA and Kerdi systems · mud beds · ANSI A108 and TCNA methods · blueprint layout · OSHA 30 · silica controls · crew lead
Custom showers (curbless, niches, benches) · Kerdi and RedGard waterproofing · natural stone and mosaics · herringbone and pattern layout · backsplashes · floor heat mats · self-leveling · customer walk-throughs
Mixing thinset and grout to ratio · wet saw and snap cutter · backer board install · grout and cleanup · material staging · jobsite housekeeping · OSHA 10 · reliable transportation and own hand tools
Tile setter certifications and licenses: what is real and what matters
Unlike electricians or plumbers, tile setters working as employees do not need a state license in most of the US. A few credentials do carry weight, and contractors know the difference between a real one and a made-up one.
- CTEF Certified Tile Installer (CTI). Run by the Ceramic Tile Education Foundation; a written test plus a hands-on module. It is the credential general contractors and architects ask for on specified commercial jobs. List it with the year.
- Advanced Certifications for Tile Installers (ACT). Hands-on tests in specific areas: large format tile and substrate preparation, membranes, mortar (mud) beds, shower receptors, grouts, and gauged porcelain tile panels. You must hold the CTI (or be a union journeyman) to take them. List each area you passed.
- OSHA 10 or OSHA 30 Construction card. Required on most commercial sites. OSHA 30 if you lead a crew.
- Respirable silica training. Cutting tile makes silica dust, and the OSHA standard requires controls; a training certificate shows you know wet cutting and HEPA vacuums are not optional.
- Union apprenticeship. The International Union of Bricklayers and Allied Craftworkers (BAC) runs tile setter and tile finisher apprenticeships through the International Masonry Institute. Journeyman status is a credential; write the local, the trade and the completion year.
- State contractor license. Only needed if you bid and contract your own jobs. California, for example, issues a C-54 Ceramic and Mosaic Tile contractor license; other states have different rules or none. As an employee you do not need one; if you hold one, it shows you can run a job.
- Manufacturer training. Schluter, Laticrete, Mapei and Custom Building Products run installer workshops; list them as training, not certifications.
Tile helper or apprentice resume with no tiling experience
Most setters start as a helper: mixing, cutting, carrying, grouting and cleaning up while learning to set. Contractors hire helpers on reliability and physical readiness more than on skill, so the resume should prove those two things.
- 1Get an OSHA 10 card (one online day) and put it in the summary. Many commercial contractors cannot bring you on site without it.
- 2List any construction, flooring, landscaping, warehouse or moving work with numbers: square feet of laminate installed, pallets moved, days on a framing crew. Related flooring work (carpet, LVP, hardwood) counts a lot.
- 3Say what you can do on day one: mix thinset to ratio, run a snap cutter, install backer board, grout and clean, read a tape to 1/16 inch, lift 80-pound mortar bags, work on knees all day.
- 4State the practical facts a contractor needs: driver's license, reliable vehicle, own basic hand tools, willingness to start at 6 a.m. and travel to sites.
- 5Add any hands-on evidence: a bathroom you tiled at home with photos in a phone album, a community college tile or construction class, a manufacturer workshop.
- 6Keep it to one page and put availability and start date at the top.
Flooring installer's helper with 14 months installing LVP and laminate (about 40,000 square feet across 90 homes) and an OSHA 10 card, moving into tile. Can mix mortar, cut on a wet saw, install backer board and grout; tiled two bathrooms (120 square feet) at home. Own truck and hand tools, available for 6 a.m. starts.
Format for a tile setter resume
- One page. A setter with 25 years fits on one page if jobs older than 10 years are one line each.
- Order: contact line with your CTI or OSHA card, 3-line summary with tile types and pace, experience with 4 to 6 bullets each, certifications, skills grouped by type, education (apprenticeship first, then high school).
- Photos of your work belong in a phone album or a link, not on the resume. A short line "portfolio of 40 completed showers available on request" is fine.
- No photo of yourself, no date of birth, city and state only. In the UK the document is a CV and the trade card is a CSCS card instead of OSHA; the layout is the same.
- Plain single-column layout, standard font, PDF. Larger flooring contractors and union halls use online applications that strip formatting, so keep it simple. Print two copies for walk-in applications; many tile shops still hire that way.
- Mirror the posting's words once each: "tile setter" or "tile installer", "large format", "waterproofing", "shower pans", "thinset", "grout", "layout", "blueprints", "OSHA 10", "commercial" or "residential". Then run the resume and posting through the cvplex ATS checker to see what you missed.
Frequently asked questions
How do I write a tile setter resume?
Lead with a summary that gives your years, the tile types and settings you have worked in, your pace in square feet a day and one callback or quality number. List each employer with 4 to 6 bullets naming materials, methods and numbers (showers built, square feet set, waste percentage). Add certifications (CTI, ACT, OSHA), a skills list grouped by tile, wet-area systems, substrates and tools, and your apprenticeship. One page.
What tiling skills should I put on a resume?
Tile types you set (porcelain, large format, natural stone, mosaics), wet-area systems (Kerdi, RedGard, mud beds, flood testing), substrate prep (self-leveling, backer board, uncoupling membranes), mortars and grouts (modified, epoxy), layout from control lines and drawings, tools (wet saw, grinder, leveling systems), and safety (OSHA 10 or 30, silica controls). Use product names contractors recognize.
What is a good tile setter job description for a resume?
Not the one from the posting. Describe your real work with numbers: "Set 200 square feet a day of 24x48 porcelain to ANSI lippage tolerance; built 60 waterproofed showers with zero callbacks; led a crew of 4 on a 120-room hotel." Each bullet should name the material, the method and a result.
Do tile setters need a license or certification?
As an employee, usually no license. The recognized certifications are the CTEF Certified Tile Installer (CTI) and the Advanced Certifications for Tile Installers (ACT), plus an OSHA 10 or 30 card for commercial sites. Contractors who bid their own jobs may need a state contractor license (California's C-54, for example); check your state.
How do I write a tiler resume with no experience?
Apply as a helper or apprentice. Get an OSHA 10 card, list related physical or flooring work with numbers, state what you can do on day one (mix, cut, backer board, grout, cleanup), and give the practical facts: license, vehicle, own tools, early starts. Any tile you have set at home, with photos available, is worth a line.
Should I list square feet per day on my resume?
Yes, with the tile size, because pace on 12x12 ceramic and on 24x48 porcelain is not comparable. Give a range you can repeat on a real job ("180 to 220 square feet a day of 12x24 porcelain"). Contractors schedule crews on these numbers and will notice an inflated one on your first day.
Ready to write yours?
The builder suggests a summary from your own experience, then checks it against the job posting.
How this page was made: a first draft was written with AI assistance from cvplex's example library, then edited and fact-checked by the cvplex Careers Team. Examples are fictional composites; numbers are illustrative. Report an error via the editorial policy page.