Formwork Carpenter CV Examples & Writing Guide
A formwork carpenter CV is judged on four things: which formwork systems you have actually set (Peri, Doka, RMD Kwikform, traditional timber), the kind of concrete work you have poured (foundations, walls, columns, decks, self-climbing cores), your tolerance and blowout record, and your safety training. Numbers beat adjectives on every line.
Formwork carpenter CV example
This sample is for a formwork carpenter with about eleven years on commercial concrete: foundations and walls, then high-rise deck and column work, now a chargehand on a multi-storey car park. The person and the companies are invented. Keep the shape and put your own systems, pour sizes and tolerances in it.
Devin Prather
Formwork Carpenter / Formwork Chargehand
Manchester · 07700 900173 · d.prather.forms@email.com
Summary
Formwork carpenter with 11 years on commercial and structural concrete. Sets Peri and RMD Kwikform wall panels, gang forms, column forms and propped table forms, plus traditional timber shuttering from drawings. Runs a 6-carpenter gang on decks averaging 880 m² a pour, held to ±6 mm on setting out with no blowouts in 4 years. CSCS Gold card, SSSTS, A40 slinger/signaller.
Experience
Formwork Chargehand · Regional concrete frame contractor (multi-storey car parks, mid-rise offices)
Apr 2022 – Present
- Lead a 6-carpenter gang forming post-tensioned decks on a 7-level multi-storey car park: 880 m² per pour, 2 pours a week through the structure.
- Set out and erect falsework and back-propping to the temporary works design, including drophead systems, with the permit to strike signed before every strike.
- Set gang wall forms up to 3.6 by 7.2 m with a 40-tonne crane, plumbed and braced to ±6 mm; zero blowouts in 4 years and roughly 220 pours.
- Run the daily pre-pour inspection with the site engineer and the temporary works supervisor: tie spacing, walings, cast-in items, chamfers and stop ends.
- Cut gang rework from about 6 percent of hours to under 2 percent by building a reusable column form kit for the four repeating sizes on the job.
Formwork Carpenter · High-rise concrete frame contractor (residential towers, 20 to 32 storeys)
Jun 2019 – Mar 2022
- Formed and struck columns, core walls and flying table forms on a 6-day floor cycle across two towers, 1,300 to 1,500 m² per floor.
- Set self-climbing core forms with the crane and hydraulic crews, keeping the core within the engineer's verticality tolerance floor after floor.
- Built traditional timber edge forms, box-outs, upstands and stair formwork from the formwork drawings, working from a 300-page set of structural drawings.
- Struck and cleaned an average of 40 panels a shift, oiled and stacked them for reuse, and got 18 to 22 uses out of ply faces instead of the usual 12.
- Worked a 12-month stretch with no reportable incidents on a site with 180 operatives.
Apprentice to Formwork Carpenter · Groundworks and foundations contractor (schools, warehouses, retail units)
Jun 2015 – May 2019
- Completed a formwork carpentry apprenticeship with college day release (NVQ Level 2 in 2017), then gained the NVQ Level 3 by on-site assessment in 2019.
- Formed pad foundations, ground beams, pile caps and slab edge forms for 20 to 30 buildings, most pours between 45 and 150 m³.
- Set steel-faced panels for basement and retaining walls up to 4.2 m high, with walings, soldiers and push-pull props per the manufacturer's pressure tables.
- Fixed reinforcement with the steel fixers when the programme required it, including starter bars, links and laps from the reinforcement drawings.
Education
NVQ Level 3 Diploma in Formwork (Construction); Level 2 via apprenticeship, 2017
Further education college and training provider, Manchester, 2019
A-levels (Maths, Physics, Design and Technology)
Sixth form college, Manchester, 2014
Certifications
- CSCS Gold Advanced Craft card (Formwork), renewed 2024
- SSSTS (CITB Site Supervision Safety Training Scheme), 2024
- CPCS A40 Slinger/Signaller, Blue card, renewed 2023
- IPAF 3a and 3b (scissor and boom MEWPs), 2024
- Emergency First Aid at Work, valid to 2027
- Full UK driving licence, clean
Skills
What a formwork foreman or site manager looks for first
Formwork gangs are hired by the formwork foreman, the frame contractor's site manager or a labour agency. They usually skim your CV standing up, and they are checking four things.
- Systems and scale. Pad foundations and ground beams are a different job from a 6-day floor cycle on a tower. Say which world you come from and which systems you have set.
- Whether the concrete came out right. Tolerance held, no blowouts, pours passing the pre-pour inspection. That is your quality record and almost nobody writes it down.
- Drawings. Can you set out from a structural set on your own, or do you need to be shown every line? Say "sets out from structural and formwork drawings" if it is true.
- Safety and the paperwork that goes with it. CSCS card, slinger/signaller, temporary works awareness, working at height. On a large main contractor's job these are gate items, not extras.
“The word I look for is "blowout". If a guy tells me he ran four years of wall pours with no blowouts, he understands pour rate, tie spacing and bracing, and he checked his work. Anyone can write "experienced in formwork". Tell me the system, the height, the tolerance and how many cubes went in behind it.”
Formwork carpenter personal statement and career objective examples
Three or four lines at the top. Years, type of concrete work, systems by name, one hard number, then your cards. If you are new or coming from another country, use a career objective instead and put your systems and your tickets in it.
Formwork carpenter with 11 years on commercial and structural concrete. Sets Peri and RMD Kwikform wall panels, gang forms, column forms and propped table forms, and builds traditional timber shuttering straight from the structural drawings. Decks average 880 m² a pour, held to ±6 mm with no blowouts in 4 years. CSCS Gold card, SSSTS, A40 slinger/signaller.
Formwork carpenter with 7 years on high-rise concrete frames: columns, core walls, flying tables and self-climbing forms on a 5 to 6 day floor cycle. Formed 41 floors across two residential towers at 1,300 to 1,500 m² per floor. Comfortable with night pours, cold-weather protection and working to the engineer's control lines.
Formwork carpenter with 5 years on pad foundations, ground beams, pile caps, retaining walls and ground-bearing slabs for schools and distribution centres. Sets steel-faced wall panels to 4.2 m with correct walings and props per the manufacturer's pressure tables. Pours from 45 to 300 m³, all passing the pre-pour inspection first time.
Shuttering carpenter with 8 years on Doka and Peri systems on residential and infrastructure projects overseas, seeking a formwork carpenter role on UK concrete frames. Experienced in wall panels, column forms, slab tables and traditional timber shuttering. Passed the CITB Health, Safety and Environment test in 2026 and holds Emergency First Aid at Work. Reads structural drawings in metric.
Formwork carpenter with 11 years, the last 3 as chargehand of gangs of 6 to 10 on car parks and mid-rise frames. Runs setting out, sets the pour sequence, orders formwork materials and signs the pre-pour checklist with the site engineer. Gangs averaged 2 pours a week with under 2 percent rework hours. Seeking a formwork foreman role.
Start with an example, finish in minutes.
No sign-up needed to start. Pick an example, adapt it with suggestions and preview it as you go.
Formwork carpenter job description bullets for a CV
A job description says what the role does. Your CV should say what you did and how it turned out. Same duties, rewritten.
| Job description language | CV bullet that gets a call |
|---|---|
| Erect and strike formwork for concrete structures. | Set and struck Peri Trio wall panels up to 3.6 by 7.2 m with a 40-tonne crane on roughly 220 pours, plumbed and braced to ±6 mm with no blowouts. |
| Read drawings. | Set out columns, walls and box-outs from a 300-page structural set and the formwork drawings, working off the engineer's control lines with a total station. |
| Install falsework and props as required. | Set falsework and back-propping to the temporary works design on 7 deck levels, including drophead systems, with the permit to strike signed before each strike. |
| Assist with concrete pours. | Ran the pour watch on 75 to 190 m³ pours: checked ties, walings and props every 30 minutes, and stopped one pour early enough to save a 12 m wall section. |
| Maintain formwork equipment. | Struck, cleaned and oiled an average of 40 panels a shift and repaired ply faces, getting 18 to 22 uses per face instead of the yard average of 12. |
| Work as part of a team. | Led a 6-carpenter gang on a 2-pour-a-week deck cycle, allocating setting out, fixing and striking and giving the daily 10-minute task briefing. |
| Follow health and safety procedures. | Worked 12 months on a 180-operative site with no reportable incidents; clipped on 100 percent of the time at height and acted as the gang's slinger/signaller. |
| Build formwork to specification. | Built a reusable column form kit for the four repeating sizes on a car park, cutting gang rework hours from about 6 percent to under 2 percent. |
| Place reinforcement where required. | Fixed starter bars, links and laps with the steel fixers to the reinforcement drawings on ground beams and pile caps, passing the engineer's reinforcement check on 30 of 30 pours. |
Skills for a formwork carpenter CV
Split the list so a site manager can find what they need. Systems first, then hand skills, then setting out and tools.
Formwork systems and structures:
- Peri (Trio, Maximo, Skydeck), Doka (Framax, Dokaflex), RMD Kwikform and other proprietary systems
- Gang forms, flying table forms, self-climbing core forms
- Column forms: steel, circular cardboard formers, adjustable
- Falsework, back-propping, drophead systems, adjustable steel props
- Traditional timber formwork, stop ends, box-outs, upstands, stair formwork
- Slipform and jump form support work
Craft skills:
- Structural and formwork drawing reading, in metric
- Setting out with total station, laser level, optical level, plumb bob and string line
- Concrete pressure and pour rate awareness (CIRIA guidance and the manufacturer's tables)
- Tie rods, she-bolts, taper ties, walings, soldiers, push-pull props
- Reinforcement placing, tying and cover spacers
- Cast-in items, holding-down bolts and sleeves set to survey lines
- Striking, cleaning, release agent, panel repair and yard stacking
- Slinging, choke and basket hitches, hand and radio signals
Tools and the practical side:
- Circular saw, chop saw, impact driver, cartridge tool, hammer drill and anchors
- MEWPs, scissor lifts, telehandler
- Cold weather protection: frost blankets, heaters, admixture awareness
- Night pours, weekend pours and overtime through a floor cycle
- Lifting and carrying panels and props all day, working at height in a harness
- Basic Polish, Romanian or English, whichever your gang is short of
Training, cards and apprenticeship: how to list them
There is no licence to be a formwork carpenter in the UK. What you can list is your NVQ or apprenticeship, your CSCS card and the safety training a main contractor asks for at induction. Give the issuer and the year.
- CSCS card: Blue Skilled Worker with an NVQ Level 2 in formwork, Gold Advanced Craft with Level 3 or for supervisors. Chargehands are often expected to hold SSSTS as well.
- Temporary works training. Formwork and falsework are temporary works under BS 5975, so a temporary works awareness or supervisor course is worth naming. Say which one.
- Slinger/signaller card (CPCS A40 or the NPORS equivalent). If you sling loads to a crane, this belongs on the page.
- IPAF for scissor and boom MEWPs, plus a telehandler or forklift card if you have one.
- Working at height and confined spaces, where your work needs them.
- Emergency First Aid at Work (1 day) or First Aid at Work (3 days).
- Apprenticeship: list the trade, the level and the year you finished. A completed formwork or carpentry apprenticeship with an NVQ is a strong line.
- CITB short courses and contractor-specific training, such as edge protection or formwork system courses from the supplier, can go in one line.
If you trained outside the UK, list what you hold and say plainly where it is from. An Irish Safe Pass, an Australian White Card or a US OSHA card is not valid on a UK site, but it does show a training history. Do not translate a foreign qualification into a UK one that does not exist. If you are unsure which CSCS card you can get, check with CSCS before you apply.
Shuttering carpenter, format and advert words
In the UK, formwork carpenter, shuttering carpenter and formworker are all used, often for the same job. Use the advert's title as your headline and put the other word in brackets once so a keyword search still finds you: "Formwork Carpenter (shuttering carpenter)".
- One page. Two only if you have 15 years and a foreman history worth listing.
- No photo, no date of birth, no marital status. That is standard on a UK CV, even though many overseas CV templates include them.
- Put a Systems line right under your personal statement listing the formwork systems you have set. It is the fastest way to be sorted into the right pile.
- Keep dates in month and year form so a site manager can see whether you worked through the winters.
- Mirror the advert: formwork, shuttering, wall forms, gang forms, table forms, falsework, back-propping, striking, setting out, tie spacing, tolerance, blowout, pour, m³, post-tensioned, permit to strike.
- Save as PDF unless the advert says otherwise, and name the file firstname-lastname-formwork-carpenter.pdf.
Frequently asked questions
What does a formwork carpenter do, in CV terms?
You build and set the moulds that wet concrete is poured into, then strike them once it has cured. On a CV that means naming the structures (foundations, walls, columns, decks, cores), the systems (Peri, Doka, RMD Kwikform or traditional timber), the size of the pours and whether the concrete came out to tolerance. Duties alone are weak; the outcome of the pour is what a site manager reads.
What skills should a formwork carpenter put on a CV?
Formwork systems by brand, falsework and back-propping, setting out from structural and formwork drawings, tie and bracing systems, concrete pressure and pour rate awareness, fixing reinforcement, striking and panel repair, and slinging with signals. Add your CSCS card, safety training and access cards. Leave off generic lines like "hard working"; they take space a system name could use.
Is a shuttering carpenter CV the same as a formwork carpenter CV?
Same trade, different word. In the UK and Ireland both are used, and shuttering is common in India, the Gulf and much of Africa too; formwork or form carpenter is the usual US and Canadian term. Use the advert's title in your headline and mention the other once in brackets, so both keyword searches find your CV.
What is a good career objective for a shuttering carpenter?
Name the systems you have worked with, how many years, and what you want next. For example: "Shuttering carpenter with 8 years on Doka and Peri wall and slab systems, seeking a formwork carpenter role on UK concrete frames. Passed the CITB HS&E test in 2026. Reads structural drawings in metric." Career objectives work best when you are changing country or coming in with no UK site history.
How do I write a formwork carpenter CV with no experience?
Lead with your carpentry apprenticeship or college course, then any concrete work at all: helping the pour gang, tying reinforcement, striking panels, cleaning forms in the yard. Get your CSCS Green Labourer card before you apply. Say you can read a tape to the millimetre, carry panels all day and work at height. Most contractors will train a formwork carpenter who turns up on time.
How long should a formwork carpenter CV be?
One page. Site managers skim, and a page that fits in one hand wins over three pages of duties. Go to two pages only if you have a long foreman history, a list of named projects worth including, or a stack of cards and qualifications that will not fit.
Should I list the projects I worked on by name?
List the type and size rather than the client name, unless the project is public and you are sure you may name it. "7-level multi-storey car park, 880 m² per pour" or "32-storey residential tower, 6-day floor cycle" tells a site manager more than a company name would, and it avoids any confidentiality problem.
Do I need to be in a union to get formwork jobs?
No. Union membership is not a condition of work on UK sites; what gets you through the gate is a CSCS card and your training record. Many formwork carpenters work through labour agencies or as self-employed subcontractors under CIS, so say on your CV whether you are PAYE or self-employed, and list your apprenticeship or NVQ with the year.
Ready to write yours?
The builder suggests a summary from your own experience, then checks it against the job posting.
How this page was made: a first draft was written with AI assistance from cvplex's example library, then edited and fact-checked by the cvplex Careers Team. Examples are fictional composites; numbers are illustrative. Report an error via the editorial policy page.