Concrete Worker Resume Examples & Writing Guide
A concrete worker resume gets an interview when the contractor can see what you have poured and finished (slabs, foundations, curb, decorative), the crew size and daily yardage you worked at, the tools you run (power trowel, screed, saw), and your safety record. Add OSHA 10 or 30 and any ACI certification. One page, no photo.
Concrete worker resume example (finisher, commercial flatwork and foundations)
This resume is for a concrete worker who started as a laborer on residential foundations and now finishes commercial slabs. The name and contractors are made up. The numbers are the kind a superintendent or foreman knows off the top of his head: yards poured per day, square feet finished, crew size, flatness specs, rework and safety record.
Marcus Villanueva
Concrete Finisher
Kansas City, MO · (816) 555-0171 · marcus.villanueva.concrete@email.com · Valid MO driver's license, own truck and tools, available for 4 a.m. pours
Summary
Concrete finisher with 7 years on commercial flatwork and residential foundations. Finishes 20,000 to 40,000 sq ft slab-on-grade pours to FF 35 / FL 25 flatness specs on an 8-person crew, runs ride-on and walk-behind power trowels, laser screed and early-entry saws. Zero rework callbacks in 3 years. OSHA 30, ACI Flatwork Finisher.
Experience
Concrete Finisher · Bluff Creek Concrete Construction (commercial concrete contractor, 80 employees), Kansas City, MO
May 2022 to Present
- Place and finish slab-on-grade, tilt-up slabs and elevated decks on warehouse and school projects; typical pour 400 to 700 cubic yards and 20,000 to 40,000 sq ft in a day on an 8-person crew.
- Run 8-foot and 10-foot ride-on power trowels and walk-behind trowels for burnished and broom finishes; slabs measured at FF 38 / FL 27 average against an FF 35 / FL 25 spec.
- Set screed pins and grades from the laser, operate the laser screed, strike off, bull float, edge and cut control joints with an early-entry saw within the window (usually 1 to 4 hours after finishing).
- Zero rework callbacks and zero owner-rejected slabs in 3 years across about 90 pours; caught and corrected 3 grade errors before concrete arrived.
- Lead the 4 a.m. pour setup: check forms, vapor barrier, rebar and chairs against the drawings, and confirm mix design and slump with the batch plant and the testing tech.
Concrete Laborer, then Finisher · Prairie Foundations LLC (residential foundations and flatwork, 30 employees), Overland Park, KS
Mar 2019 to Apr 2022
- Set and stripped aluminum forms for 6 to 8 basement foundations a week (footings, 8- to 9-foot walls, garage slabs); tied rebar, set anchor bolts and ran the vibrator during wall pours.
- Poured and finished driveways, patios and sidewalks (about 1,500 sq ft a day) with a 4-person crew, including broom finish, edging and jointing; promoted to finisher after 18 months.
- Mixed and placed grout and mortar for repairs, patched honeycombing and rubbed walls with a 100% pass rate on county footing and wall inspections in 2021.
- Operated a skid steer and a 1-ton dump truck to move forms, gravel and spoils; zero equipment incidents in 3 years.
Education
High School Diploma
Ruskin High School, Kansas City, MO, 2018
Certifications
- OSHA 30-Hour Construction (2023)
- ACI Concrete Flatwork Finisher and Technician (2024)
- First Aid, CPR and AED (American Red Cross, 2025)
- Skid steer and forklift operator (employer certified, 2020)
Skills
What concrete contractors check first on a resume
Concrete resumes are read by a superintendent, a foreman or the owner of the company, usually on a phone between pours. They have a pour on Thursday and need to know if you can be on the crew. They are checking four things.
- What have you poured and finished? Slab-on-grade, foundations, elevated decks, tilt-up, curb and gutter, sidewalks, decorative. Commercial flatwork and residential foundations are different crews. Name the type of work, the size of a typical pour (yards and square feet) and the crew size.
- Laborer or finisher? Laborers form, strip, tie rebar, place and run the vibrator. Finishers screed, float, trowel, edge, joint and know when the slab is ready. Foremen set grades, order concrete and run the pour. Say which you are and what you are moving toward. Finishing skill is what gets the pay bump, so show it with specs (FF/FL, broom finish quality, zero callbacks).
- Can you run the equipment? Ride-on trowel, laser screed, early-entry saw, skid steer, plate compactor. Each one you can run is one less person the foreman has to find.
- Will you be there at 4 a.m. and can you get there? Pours start early, run long and do not wait. A driver's license, your own transportation and a line like "available for early pours, weekends and out-of-town work" answers the question before the phone call. Safety record and OSHA card come right after.
“I want to know what you have finished and how big. If you tell me you finished 30,000 square feet a day on a warehouse slab and you can run a ride-on, I already know what to pay you. 'Hard worker' tells me nothing; every guy on my crew is a hard worker.”
Concrete laborer and finisher job description for a resume: weak to strong
Most concrete resumes say "poured concrete, finished concrete, set forms". Every applicant did that. Add the type of pour, the size, the tool, and one number the foreman can check, and the same duty proves what you can do. Seven rewrites from real concrete work:
| Weak (duty only) | Strong (type of pour, size, number) |
|---|---|
| Poured and finished concrete. | Placed and finished 20,000 to 40,000 sq ft warehouse slabs (400 to 700 cubic yards a pour) on an 8-person crew; ran the ride-on trowel for a burnished finish measured at FF 38 against an FF 35 spec. |
| Set forms for foundations. | Set and stripped aluminum wall forms for 6 to 8 residential basements a week (8- to 9-foot walls, footings, garage slabs); 100% pass rate on county inspections in 2021. |
| Tied rebar. | Tied and placed #4 and #5 rebar mats on chairs at 12- and 18-inch spacing for 15,000 sq ft slabs, checked against the structural drawings before every pour; zero inspector corrections in 2 years. |
| Cut joints in slabs. | Laid out and cut control joints with an early-entry saw to the joint plan (12- to 15-foot grids) within 1 to 4 hours of final finish; no random cracking reported on 30 slabs. |
| Operated equipment. | Operated a laser screed, skid steer, plate compactor and 1-ton dump truck daily; zero equipment incidents and zero property damage claims in 4 years. |
| Did curb and sidewalk work. | Formed, poured and finished about 300 linear feet of curb and gutter or 1,500 sq ft of sidewalk a day (broom finish, tooled joints, ADA ramp slopes checked with a smart level) on city street projects. |
| Followed safety rules. | Zero recordable injuries in 7 years; used wet cutting and vacuum controls on every saw cut under the OSHA silica rule, and completed daily toolbox talks and trench inspections as the crew's competent-person backup. |
Concrete worker skills for a resume (laborer and finisher)
Group your skills the way a foreman thinks: what you can place and finish, what tools you run, forming and reinforcement, reading plans and specs, equipment, safety. Ten to fifteen items is enough. Leave off "Microsoft Office" and "communication".
Form setting and stripping (aluminum, wood, symons) · Rebar tying, chairs, mesh, dowels · Vapor barrier · Placing and vibrating · Screed and bull float · Wheelbarrow and buggy · Plate compactor, jackhammer, concrete saw · Skid steer · Grade checking with laser and string line · Cleanup and form oiling · OSHA 10 · Early starts, weekends, out-of-town
Ride-on and walk-behind power trowels · Laser and vibratory screed · Bull float, fresno, hand floats · Edging and jointing · Early-entry saw and joint layout · Burnished, broom, exposed aggregate and stamped finishes · Cure and seal · FF/FL specs · Slump and air checks · ACI Flatwork Finisher · OSHA 30
- List each piece of equipment you can run without supervision. A ride-on trowel or laser screed operator is hard to find.
- Physical requirements are real for this job: say you can lift 80 to 100 lb bags and work 10- to 12-hour pour days in heat and cold. It answers a question the foreman is already asking.
- Spanish and English bilingual is a real skill on many US concrete crews; list it if you have it.
Start with an example, finish in minutes.
No sign-up to start. Download works. One-time $12 for a clean PDF, no subscription.
Certifications for a concrete worker resume (OSHA, ACI, union apprenticeship)
No state licenses individual concrete laborers or finishers (contractors who run their own company need a contractor license in most states, such as California's C-8). Contractors hire on what you have poured and who vouches for you. But a few cards and certifications are recognized across the industry, and some are required on commercial and public jobs. List the ones you hold with the year.
- OSHA 10-Hour Construction: the standard entry card; required on many commercial sites and on all public work in some states (New York, Nevada and others require it by law). OSHA 30 is expected for foremen and lead finishers.
- ACI (American Concrete Institute) certifications: Concrete Flatwork Finisher for finishers (ACI also offers Flatwork Technician and Advanced Flatwork Finisher levels; use the exact title printed on your card); Concrete Field Testing Technician Grade I if you take slump, air and cylinder samples. Recognized nationwide and often listed as preferred in commercial postings.
- Cement mason apprenticeship: a completed 3- or 4-year registered apprenticeship through the OPCMIA (the cement masons' union) or a non-union contractor association is the strongest credential in the trade. List it under Education with the sponsor and completion year.
- Equipment cards: skid steer, forklift, aerial lift, and a CDL Class A or B if you drive the mixer, dump truck or pull the trailer. Employer-issued cards count; say who certified you.
- Safety training: First Aid/CPR/AED, OSHA silica awareness (the respirable crystalline silica standard covers every saw cut and grind), confined space, trenching and excavation competent person, and fall protection for elevated deck work.
Concrete finisher and laborer resume summary examples
Two or three lines at the top: your role (laborer, finisher, foreman) and years; the type of work and typical pour size; the tools you run; one number and your availability. Use an objective (one line) only if you have never worked on a concrete crew.
Concrete laborer with 3 years on residential and light commercial crews: forming and stripping footings and walls, tying rebar, placing and vibrating on pours up to 150 yards. Runs a skid steer and plate compactor, holds OSHA 10, and has missed 2 days in 3 years. Own truck, available for early and weekend pours.
Concrete finisher with 7 years, the last 4 on commercial slab-on-grade and tilt-up (20,000 to 40,000 sq ft pours, 8-person crew). Runs ride-on trowels and laser screed to FF 35 / FL 25 specs with zero callbacks in 3 years. OSHA 30, ACI Flatwork Finisher, First Aid/CPR.
Decorative concrete finisher with 9 years in stamped, colored, exposed-aggregate and polished work for residential and hospitality clients. Completed about 120 stamped patios and pool decks (300 to 2,500 sq ft each) with integral and broadcast color, and a 95% repeat-referral rate for the company. Runs planetary grinders and densifier and sealer systems.
Concrete foreman with 14 years, running crews of 10 to 15 on commercial foundations and flatwork up to 900 yards a day. Plans pours, orders concrete and pumps, sets grades and holds the crew to zero recordable injuries for 5 years. OSHA 30, competent person for trenching and silica, ACI Field Testing Grade I.
Seeking a concrete laborer position with Bluff Creek Concrete. Two years of landscaping and hardscape work (paver patios, retaining walls, grading with a skid steer), OSHA 10 card earned in June 2026, own truck, and available for 4 a.m. starts six days a week.
Concrete laborer resume with no experience
Concrete crews hire laborers with no concrete experience all the time; the work is taught on the job. What they cannot teach is showing up at 4 a.m., handling heat and heavy lifting, and following the foreman's direction on a pour that cannot stop. Your resume has to prove those with whatever you have done.
- 1Get an OSHA 10 card before you apply. It costs under $100 online, takes two evenings, and many commercial sites will not let you on without it.
- 2Open with a one-line objective that names the job and your availability (early starts, weekends, out-of-town), plus your driver's license and transportation.
- 3List any physical or outdoor work: landscaping, roofing, framing, farm work, moving, warehouse, military. Pull out the parts that look like concrete: shoveling and grading, running a wheelbarrow, lifting 80-lb bags, using a skid steer, reading a tape and a level. Add one number each.
- 4Add a short skills list of what you already know: tape measure and level, mixing bagged concrete, using a shovel and rake, basic tools, skid steer or forklift if you have run one.
- 5Mention your attendance record from your last job. Foremen care about it more than anything else on the page.
Landscaping laborer, Greenway Outdoor Services (Apr 2024 to Aug 2026): graded and compacted base for about 40 paver patios and walkways, set 600 linear feet of retaining wall block, mixed and placed bagged concrete for footings and posts, and ran a skid steer; zero missed days over two seasons.
Warehouse associate, 2023 to 2026: lifted and stacked 50- to 90-lb cases for 10-hour shifts, operated a forklift with zero incidents, and worked 5 a.m. starts with one unplanned absence in three years.
Format and length for a concrete worker resume (and the "concreter" CV)
Most concrete contractors are small and read resumes on a phone or a printout. Large general contractors and public agencies run them through an applicant tracking system. A plain one-page layout works for both, and it is also what you hand over when you walk onto a job site.
- One page, always. Fifteen years of concrete fits on one page when older jobs get one line each.
- Order: contact line with license, transportation and availability; two-line summary; skills; work history newest first with pour types and numbers; certifications; education.
- Standard headings, one column, normal font, no photo, no colored boxes. A PDF for online applications; bring printed copies to the yard.
- Mirror the posting's words once each: "concrete finisher" or "concrete laborer", "flatwork", "foundations", "forming", "rebar", "screed", "power trowel", "OSHA 10", "ACI", and the equipment they name.
- Include seasonal gaps honestly. Northern concrete work slows down from December to March; "seasonal layoff, recalled March 2025" is normal and expected.
- Australia and the UK call this trade "concreter" and the document a CV. Same rules: no photo, no date of birth, one page. If you are applying there, use their term and mention any white card (Australia) or CSCS card (UK) instead of OSHA.
Run your resume and the posting through the cvplex ATS checker before you apply online. It shows which trade words from the posting you are missing and whether your skills list parsed as one.
Frequently asked questions
How do I write a concrete finisher resume?
Lead with a two-line summary: years, type of work (flatwork, foundations, decorative), typical pour size, the finishing tools you run and one number such as flatness spec or zero callbacks. Group your skills by finishing tools, finishes, forming and equipment. Write each job with the pour type, size, crew and a result. Add OSHA and ACI cards. One page.
What is a good job description for a concrete laborer on a resume?
Name the type of work and the numbers: "Set and stripped aluminum forms for 6 to 8 residential basements a week, tied rebar to the drawings, placed and vibrated wall pours up to 150 yards, and ran a skid steer and plate compactor; zero equipment incidents in 3 years." Type of pour, size, tools, one checkable number.
What skills should be on a concrete worker resume?
For laborers: forming and stripping, rebar tying, placing and vibrating, screeding, plate compactor and concrete saw, skid steer, grade checking, cleanup. For finishers: power trowels, laser screed, floats, edging and jointing, early-entry saw, finish types (broom, burnished, stamped), FF/FL specs, cure and seal. For everyone: OSHA 10 or 30, physical stamina, early availability and a driver's license.
What is a good concrete finisher resume summary?
For example: "Concrete finisher with 7 years on commercial slab-on-grade and tilt-up (20,000 to 40,000 sq ft pours, 8-person crew). Runs ride-on trowels and laser screed to FF 35 / FL 25 specs with zero callbacks in 3 years. OSHA 30, ACI Flatwork Finisher." Role and years, type and size of work, tools, one number, credentials.
How do I get a concrete job with no experience?
Get an OSHA 10 card, write a one-line objective with your availability and transportation, and list any physical outdoor work (landscaping, framing, farm work, warehouse) with the parts that look like concrete: grading, shoveling, lifting, running a skid steer, reading a tape. Show your attendance record. Then apply in person at contractor yards early in the morning; many crews still hire that way.
Do I need certifications to be a concrete finisher?
No license is required in the US. OSHA 10 is expected on commercial sites and required by law on some public work. ACI Concrete Flatwork Finisher and Technician is the recognized finisher credential and is often listed as preferred. A completed cement mason apprenticeship is the strongest credential. List what you hold with the year and never claim a card you do not have.
Ready to write yours?
The builder suggests a summary from your own experience, then checks it against the job posting.
How this page was made: a first draft was written with AI assistance from cvplex's example library, then edited and fact-checked by the cvplex Careers Team. Examples are fictional composites; numbers are illustrative. Report an error via the editorial policy page.