Concreter CV Examples & Writing Guide

A concreter CV gets an interview when the contractor can see what you have poured and finished (slabs, foundations, kerbs, decorative), the gang size and daily volume you worked at, the kit you run (power float, screed, saw), and your safety record. Add your CSCS card and any NVQ. One page, no photo.

By cvplex Careers Team· Reviewed by József Dorcsinecz, Founder· Updated

Concreter CV example (finisher, commercial floors and foundations)

This CV is for a concreter who started as a groundworker on housing foundations and now finishes commercial floor slabs. The name and contractors are made up. The numbers are the kind a site manager or foreman knows off the top of their head: cubic metres poured per day, square metres finished, gang size, floor tolerances, rework and safety record.

Marcus Villanueva

Concrete Finisher

Birmingham · 07700 900171 · marcus.villanueva.concrete@email.com · Full UK driving licence, own van and tools, available for 5 a.m. pours

Summary

Concrete finisher with 7 years on commercial ground-bearing slabs and housing foundations. Finishes 1,900 to 3,700 m² floor pours to TR34 surface regularity specs on an 8-person gang, runs ride-on and walk-behind power floats, laser screed and early-entry saws. Zero rework call-backs in 3 years. CSCS Blue card, NVQ Level 2.

Experience

Concrete Finisher · Commercial concrete flooring contractor (80 employees), Birmingham

May 2022 to Present

  • Place and finish ground-bearing slabs and suspended slabs on warehouse and school projects; typical pour 300 to 530 m³ and 1,900 to 3,700 m² in a day on an 8-person gang.
  • Run 2.4 m and 3 m ride-on power floats and walk-behind floats for power-floated and brushed finishes; every floor survey in 2025 came in within the specified TR34 class.
  • Set screed rails and levels from the laser, operate the laser screed, strike off, bull float, edge and cut sawn joints with an early-entry saw within the window (usually 1 to 4 hours after finishing).
  • Zero rework call-backs and zero client-rejected floors in 3 years across about 90 pours; caught and corrected 3 level errors before the concrete arrived.
  • Lead the 5 a.m. pour set-up: check formwork, DPM, reinforcement and spacers against the drawings, and confirm the mix and slump with the ready-mix supplier and the testing technician.

Groundworker, then Concrete Finisher · Housing foundations and external works contractor (30 employees), Coventry

Mar 2019 to Apr 2022

  • Set out and poured trench-fill and strip foundations, and formed ground-bearing slabs and garage bases, for 6 to 8 plots a week; fixed reinforcement and starter bars and ran the poker during pours.
  • Poured and finished driveways, patios and footpaths (about 140 m² a day) with a 4-person gang, including brushed finish, edging and jointing; promoted to finisher after 18 months.
  • Mixed and placed grout and mortar for repairs, patched honeycombing and made good walls, with a 100% pass rate on building control and warranty foundation inspections in 2021.
  • Operated a skid steer loader and a forward tipping dumper to move formwork, aggregate and spoil; zero plant incidents in 3 years.

Education

GCSEs (4 at grades 9–4, including Maths)
Secondary school, Birmingham, 2018

Certifications

  • CSCS Blue Skilled Worker card (2021, renewed 2026)
  • NVQ Level 2 in concrete operations, on-site assessment route (2021)
  • Emergency First Aid at Work (2025)
  • NPORS skid steer loader and forward tipping dumper cards (2020, renewed 2025)

Skills

Placing and finishing: ground-bearing slabs, suspended slabs, foundations and bases, kerbs and channels, footpaths, drivewaysFinishing kit: ride-on and walk-behind power floats, laser screed, vibrating beam, bull float, hand floats, edgers, groovers, early-entry sawFinishes: power-floated, brushed, exposed aggregate, pattern imprinted and coloured (basic), curing and sealing, surface hardenerFormwork: steel and timber shuttering, striking, release agent, setting levels with laser and string line, holding-down bolts, cast-in itemsReinforcement: fixing bar and mesh, spacers and chairs, dowels, DPM placementReading foundation and slab drawings, joint layout plans, floor tolerance (TR34) specs, slump checks and cube samplingPlant: skid steer loader, plate compactor, poker vibrator, forward tipping dumper, telehandlerSafety: CSCS card, silica dust controls (wet cutting, extraction), isolating floats and saws, excavation awareness
Fictional example. Names, employers and numbers are illustrative.Use this example in the builder →
Notice the mix of cubic metres, square metres, gang size and floor tolerance numbers. A site manager can place this person on a gang in one read. If you do not know your floor's survey results, ask the foreman; the surveyor or testing company measured them.

What concrete contractors check first on a CV

Concreter CVs are read by a site manager, a foreman or the owner of the company, usually on a phone between pours. They have a pour on Thursday and need to know if you can be on the gang. They are checking four things.

  • What have you poured and finished? Ground-bearing slabs, foundations, suspended slabs, kerbs, footpaths, decorative. Commercial floors and housing foundations are different gangs. Name the type of work, the size of a typical pour (m³ and m²) and the gang size.
  • Labourer or finisher? Labourers form, strike, fix reinforcement, place and run the poker. Finishers screed, float, trowel, edge, joint and know when the slab is ready. Foremen set levels, order concrete and run the pour. Say which you are and what you are moving towards. Finishing skill is what gets the better rate, so show it with specs (floor tolerances, finish quality, zero call-backs).
  • Can you run the kit? Ride-on power float, laser screed, early-entry saw, skid steer, dumper, plate compactor. Each one you can run is one less person the foreman has to find, and plant needs a CPCS or NPORS card on most sites.
  • Will you be there at 5 a.m. and can you get there? Pours start early, run long and do not wait. A driving licence, your own transport and a line like "available for early pours, weekends and working away" answers the question before the phone call. Safety record and CSCS card come right after.

“I want to know what you have finished and how big. If you tell me you finished 2,800 square metres a day on a warehouse slab and you can run a ride-on, I already know what to pay you. 'Hard worker' tells me nothing; every lad on my gang is a hard worker.”

Recruiter panel, Commercial concrete contractor hiring manager, US (name published after review)

Concrete labourer and finisher job description for a CV: weak to strong

Most concreter CVs say "poured concrete, finished concrete, set up formwork". Every applicant did that. Add the type of pour, the size, the tool, and one number the foreman can check, and the same duty proves what you can do. Seven rewrites from real concrete work:

Weak (duty only)Strong (type of pour, size, number)
Poured and finished concrete.Placed and finished 1,900 to 3,700 m² warehouse floors (300 to 530 m³ a pour) on an 8-person gang; ran the ride-on power float for a power-floated finish that met the specified TR34 class on every survey.
Did foundations.Set out and poured trench-fill and strip foundations, slabs and garage bases for 6 to 8 housing plots a week; 100% pass rate on building control and warranty inspections in 2021.
Fixed rebar.Fixed H12 and H16 bar mats on chairs at 200 and 300 mm centres for 1,400 m² slabs, checked against the structural drawings before every pour; zero corrections at pre-pour inspection in 2 years.
Cut joints in slabs.Set out and cut sawn joints with an early-entry saw to the joint plan (3.5 to 4.5 m grids) within 1 to 4 hours of final finish; no random cracking reported on 30 slabs.
Operated plant.Operated a laser screed, skid steer loader, plate compactor and forward tipping dumper daily; zero plant incidents and zero property damage claims in 4 years.
Did kerbs and footpaths.Laid about 90 metres of kerb or poured and finished 140 m² of footpath a day (brushed finish, tooled joints, dropped kerbs and tactile paving checked to the highways drawings) on local authority road schemes.
Followed safety rules.Zero reportable injuries in 7 years; used wet cutting and extraction on every saw cut to control silica dust, and completed daily toolbox talks and excavation checks as the gang's backup to the appointed competent person.
Where your numbers live: the ready-mix delivery tickets and supplier invoices (m³), the drawings (m² and joint spacing), the testing company's and surveyor's reports (floor tolerances, slump, cube strengths), and the foreman's site diary (gang size, hours, incidents).

Concreter skills for a CV (labourer and finisher)

Group your skills the way a foreman thinks: what you can place and finish, what kit you run, formwork and reinforcement, reading drawings and specs, plant, safety. Ten to fifteen items is enough. Leave off "Microsoft Office" and "communication".

Skills line for a concrete labourer CV
Formwork and shuttering, setting up and striking (steel and timber) · Fixing bar and mesh, chairs, dowels · DPM · Placing and vibrating · Screeding and bull float · Barrow and dumper · Plate compactor, breaker, concrete saw · Skid steer loader · Level checking with laser and string line · Cleaning down and release agent · CSCS Green card · Early starts, weekends, working away
Skills line for a concrete finisher CV
Ride-on and walk-behind power floats · Laser screed and vibrating beam · Bull float, hand floats and trowels · Edging and jointing · Early-entry saw and joint layout · Power-floated, brushed, exposed aggregate and pattern imprinted finishes · Curing and sealing · TR34 floor tolerances · Slump checks and cube sampling · NVQ Level 2 · CSCS Blue card
  • List each piece of kit you can run without supervision, and the CPCS or NPORS card for any plant. A ride-on power float or laser screed operator is hard to find.
  • Physical requirements are real for this job: say you can handle 25 kg bags all day and work 10- to 12-hour pour days in heat and cold. It answers a question the foreman is already asking.
  • A second language (Polish, Romanian, Portuguese and others) is useful on many UK concrete gangs; list it if you have it.

Start with an example, finish in minutes.

No sign-up needed to start. Pick an example, adapt it with suggestions and preview it as you go.

Build my concreter CV

Cards and qualifications for a concreter CV (CSCS, NVQ, apprenticeship)

There is no licence to work as a concreter or concrete finisher in the UK. Contractors hire on what you have poured and who vouches for you. But a few cards and qualifications are recognised across the industry, and most major sites require a CSCS card. List the ones you hold with the year.

  • CSCS card (Construction Skills Certification Scheme): the standard site card. Broadly, green is for labourers (usually the CITB Health, Safety and Environment test plus a Level 1 health and safety award), blue for skilled workers with an NVQ Level 2, and gold for supervisors. Card rules change, so check the CSCS website.
  • NVQ Level 2 in a concreting or groundworks pathway: the qualification behind a blue skilled worker card. Experienced concreters can achieve it through an on-site assessment route instead of college. Use the exact title printed on your certificate.
  • Apprenticeship: a completed groundworker or civil engineering operative apprenticeship is the strongest training on a concreter CV. List it under Education with the training provider and completion year.
  • Plant and driving: CPCS or NPORS cards for the plant you use (dumper, skid steer loader, telehandler, excavator), plus a category C1 or C licence and Driver CPC if you drive a mixer or tipper. Say which scheme and category.
  • Safety training: Emergency First Aid at Work, silica dust awareness (cutting and grinding concrete creates respirable crystalline silica, which HSE treats as a serious health risk), confined spaces, excavation awareness, working at height for suspended slab work, and SSSTS for gangers and foremen.
Do not list a card or NVQ you do not hold; cards are checked at site induction, often by scanning them. Do not list a driving licence category you do not have. If an advert asks for a card you are unsure about, check the CSCS website or ask the contractor.

Concrete finisher and labourer personal statement examples

Two or three lines at the top: your role (labourer, finisher, foreman) and years; the type of work and typical pour size; the kit you run; one number and your availability. Use a career objective (one line) only if you have never worked on a concrete gang.

Concrete labourer, experienced
Concrete labourer with 3 years on housing and light commercial gangs: forming and striking foundations and slabs, fixing reinforcement, placing and vibrating on pours up to 115 m³. Runs a skid steer loader and plate compactor, holds a CSCS Green card, and has missed 2 days in 3 years. Own transport, available for early and weekend pours.
Concrete finisher, commercial floors
Concrete finisher with 7 years, the last 4 on commercial ground-bearing and suspended slabs (1,900 to 3,700 m² pours, 8-person gang). Runs ride-on power floats and laser screed to TR34 floor tolerances with zero call-backs in 3 years. CSCS Blue card, NVQ Level 2, Emergency First Aid at Work.
Decorative concrete finisher
Decorative concrete finisher with 9 years in pattern imprinted, coloured, exposed-aggregate and polished work for homeowners and hospitality clients. Completed about 120 imprinted patios and pool surrounds (30 to 230 m² each) with integral and surface-applied colour, and a 95% repeat-referral rate for the company. Runs planetary grinders and densifier and sealer systems.
Concrete foreman
Concrete foreman with 14 years, running gangs of 10 to 15 on commercial foundations and floors of up to 700 m³ a day. Plans pours, orders concrete and pumps, sets levels and has kept the gang to zero reportable injuries for 5 years. CSCS Gold Supervisor card, SSSTS, trained in concrete testing (slump and cubes).
Career objective, no concrete experience
Seeking a concrete labourer role with a commercial floor-slab contractor. Two years of landscaping and hard landscaping work (block paving, retaining walls, levelling with a skid steer), CSCS Green card gained in June 2026, own transport, and available for 5 a.m. starts six days a week.

Concrete labourer CV with no experience

Concrete gangs take on labourers with no concrete experience all the time; the work is taught on the job. What they cannot teach is turning up at 5 a.m., handling heat, cold and heavy lifting, and following the foreman's direction on a pour that cannot stop. Your CV has to prove those with whatever you have done.

  1. 1Get a CSCS Green Labourer card before you apply. It usually takes a one-day health and safety course plus a short computer test, and most major sites will not let you on without a card.
  2. 2Open with a one-line career objective that names the job and your availability (early starts, weekends, working away), plus your driving licence and transport.
  3. 3List any physical or outdoor work: landscaping, roofing, labouring, farm work, removals, warehouse, the armed forces. Pull out the parts that look like concrete: shovelling and levelling, running a barrow, lifting 25 kg bags, using a skid steer, reading a tape and a level. Add one number each.
  4. 4Add a short skills list of what you already know: tape measure and level, mixing bagged concrete, using a shovel and rake, basic tools, skid steer or forklift if you have run one.
  5. 5Mention your attendance record from your last job. Foremen care about it more than anything else on the page.
Entry-level bullet (landscaping reframed)
Landscaping labourer, local landscaping company (Apr 2024 to Aug 2026): dug out, levelled and compacted the sub-base for about 40 block-paved patios and paths, laid 180 metres of retaining wall block, mixed and placed bagged concrete for footings and posts, and ran a skid steer; zero missed days over two seasons.
Entry-level bullet (warehouse reframed)
Warehouse operative, 2023 to 2026: lifted and stacked cases of up to 25 kg on 10-hour shifts, operated a counterbalance forklift with zero incidents, and worked 5 a.m. starts with one unplanned absence in three years.

Format and length for a concreter CV

Most concrete contractors are small and read CVs on a phone or a printout. Large main contractors and labour agencies run them through an applicant tracking system. A plain one-page layout works for both, and it is also what you hand over when you walk onto a site.

  • One page, always. Fifteen years of concrete work fits on one page when older jobs get one line each.
  • Order: contact line with driving licence, transport and availability; two-line personal statement; skills; work history newest first with pour types and numbers; cards and qualifications; education.
  • Standard headings, one column, normal font, no photo, no date of birth, no coloured boxes. A PDF for online applications; bring printed copies to the yard.
  • Mirror the advert's words once each: "concreter", "concrete finisher" or "concrete labourer", "floors", "foundations", "formwork", "steel fixing", "screed", "power float", "CSCS", "NVQ", and the plant they name.
  • Include seasonal gaps honestly. Concrete work slows in hard frosts and over Christmas; "seasonal lay-off, back with the same contractor March 2025" is normal and expected.
  • US contractors call this trade "concrete finisher" or "cement mason" and the document a resume. If you apply in Ireland, the same CV rules apply, but the site safety card there is Safe Pass rather than CSCS.

Run your CV and the advert through the cvplex ATS checker before you apply online. It shows which trade words from the advert you are missing and whether your skills list was read as one.

Frequently asked questions

How do I write a concrete finisher CV?

Lead with a two-line personal statement: years, type of work (floors, foundations, decorative), typical pour size, the finishing kit you run and one number such as floor tolerance or zero call-backs. Group your skills by finishing kit, finishes, formwork and plant. Write each job with the pour type, size, gang and a result. Add your CSCS card and NVQ. One page.

What is a good job description for a concrete labourer on a CV?

Name the type of work and the numbers: "Poured trench-fill foundations and formed slabs for 6 to 8 housing plots a week, fixed reinforcement to the drawings, placed and vibrated pours up to 115 m³, and ran a skid steer and plate compactor; zero plant incidents in 3 years." Type of pour, size, tools, one checkable number.

What skills should be on a concreter CV?

For labourers: formwork and striking, fixing reinforcement, placing and vibrating, screeding, plate compactor and concrete saw, skid steer and dumper, level checking, cleaning down. For finishers: power floats, laser screed, floats and trowels, edging and jointing, early-entry saw, finish types (brushed, power-floated, pattern imprinted), floor tolerances, curing and sealing. For everyone: a CSCS card, physical stamina, early availability and a driving licence.

What is a good concrete finisher personal statement?

For example: "Concrete finisher with 7 years on commercial ground-bearing and suspended slabs (1,900 to 3,700 m² pours, 8-person gang). Runs ride-on power floats and laser screed to TR34 floor tolerances with zero call-backs in 3 years. CSCS Blue card, NVQ Level 2." Role and years, type and size of work, kit, one number, cards.

How do I get a concrete job with no experience?

Get a CSCS Green card, write a one-line career objective with your availability and transport, and list any physical outdoor work (landscaping, labouring, farm work, warehouse) with the parts that look like concrete: levelling, shovelling, lifting, running a skid steer, reading a tape. Show your attendance record. Then register with construction labour agencies and call groundworks and concrete contractors directly; many gangs still hire by word of mouth.

Do I need qualifications to be a concrete finisher in the UK?

No licence is required in the UK. A CSCS card is expected on most major sites, and a blue skilled worker card needs an NVQ Level 2, which experienced finishers can get through on-site assessment. A completed groundworks apprenticeship is the strongest training, and CPCS or NPORS cards are needed for plant. List what you hold with the year and never claim a card you do not have.

Ready to write yours?

The builder suggests a summary from your own experience, then checks it against the job posting.

How this page was made: a first draft was written with AI assistance from cvplex's example library, then edited and fact-checked by the cvplex Careers Team. Examples are fictional composites; numbers are illustrative. Report an error via the editorial policy page.