Dry Liner CV Examples & Writing Guide

A dry liner CV gets a call when it shows what you fix and finish (board type, metal stud, MF ceilings, taping and jointing), your production rate in boards or m² a day, and the cards a main contractor needs on site: CSCS, IPAF and silica training. Below is a full sample CV, then bullets, skills and a no-experience version.

By cvplex Careers Team· Reviewed by József Dorcsinecz, Founder· Updated

Dry liner CV example (fixer and finisher)

Dry lining splits into two trades that often get one job title. Fixers build the metal-stud framing and screw the board up; tapers and jointers tape, fill and sand the joints to the finish the specification asks for. Say which one you are, or say you do both, in the first line. This sample is a commercial fixer who also tapes and joints to a paint-ready finish. The name and companies are made up.

Tomás Reyes

Dry Liner / Interior Systems Fixer

Birmingham · 07700 900164 · tomas.reyes@email.com · CSCS Blue · Own tools and van

Summary

Dry liner with 11 years on commercial and residential schemes, fixing metal-stud partitions, shaft walls and MF ceilings and taping and jointing to a paint-ready finish. Fixes 45 to 55 boards (2400 x 1200 mm) on a straightforward wall day and finishes to a high standard on lobby and healthcare work. Reads architectural drawings and the manufacturer's fire-rated system details, and runs a gang of 4. CSCS Blue card, IPAF and PASMA trained, silica-aware.

Experience

Dry Lining Foreman / Fixer · Interior fit-out subcontractor, commercial and healthcare, West Midlands

May 2020 - Present

  • Lead a gang of 4 fixing and finishing metal-stud partitions on projects from 1,900 to 16,700 m², including a 6-storey medical centre fit-out.
  • Fix 45 to 55 boards (2400 x 1200 mm) on standard wall days and 25 to 30 on ceilings and bulkheads, working off scissor lifts and mobile towers.
  • Build fire-rated and acoustic partition systems to the manufacturer's tested details, including 2-hour shaft walls and deflection heads, and pass the fire-stopping and partition inspection first time on 9 of the last 10 jobs.
  • Tape and joint to a paint-ready finish on standard walls and a skimmed finish in lobbies and corridors under critical lighting; dry lining snagging items dropped from 40 to 12 on the last three projects.
  • Take off board, screws, beads and jointing compound from the drawings for each floor, keeping material waste under 6% against an 8% allowance.

Dry Liner (Fixer and Taper) · Residential dry lining contractor, West Midlands

Mar 2017 - Apr 2020

  • Boarded and finished 60-plus flats in a 220-flat new-build scheme, averaging one two-bedroom flat boarded per two-person day.
  • Ran automatic taping tools (bazooka, flat boxes, angle head) on repeat flat layouts, cutting finishing time per flat by about a day and a half.
  • Fixed moisture-resistant and cement board in bathrooms and behind tiling, and impact-resistant board in corridors.
  • Kept a clean working-at-height record over 3 years, working off podium steps, mobile towers and 6 m scissor lifts.

Dry Lining Labourer / Improver · Small refurbishment and office fit-out contractor, Birmingham

Jun 2015 - Feb 2017

  • Loaded out and cut board, set screws, mixed compound and cleaned up for two fixers on office fit-outs of 140 to 750 m².
  • Learned to board ceilings, patch and skim, and to repair water-damaged board in occupied offices with dust control in place.
  • Passed the CITB HS&E test and gained a CSCS Green Labourer card in the first 90 days, and never missed a scheduled shift in 20 months.

Education

BTEC Level 3 Extended Diploma in Construction and the Built Environment
Sixth form college, Birmingham, 2015

NVQ Level 2 in Interior Systems (dry lining), on-site assessment route
Training provider, Birmingham, 2019

Certifications

  • CSCS Blue Skilled Worker card, renewed 2024
  • IPAF 3a and 3b (scissor and boom MEWPs), current
  • Silica dust awareness and RPE face-fit test, 2025
  • PASMA (mobile towers) and working at height, renewed 2024
  • Emergency First Aid at Work (1 day), renewed 2025

Skills

Metal stud framing and setting outBoard fixing: 12.5 mm and 15 mm standard, fire-rated, moisture-resistant, impact-resistant, cement boardShaft wall and separating wall systemsFire-rated and acoustic partition systems (British Gypsum, Siniat, Knauf)Taping and jointing to a paint-ready finishAutomatic taping tools (bazooka, flat box, angle head)Beads, trims and shadow gap installationSuspended ceiling grid and tileInsulation and acoustic sealantDrawing reading and material take-offsScissor lifts, boom lifts and mobile towersPatching, skimming and making good
Fictional example. Names, employers and numbers are illustrative.Use this example in the builder →
Put your CSCS card in the header line next to your phone number. On commercial jobs a site manager cannot let you through induction without it, so a CV that shows CSCS and IPAF in the first line moves ahead of one that hides them on page two.

What a dry lining foreman looks for first

The person hiring you is trying to work out how many boards you will put up on your first Monday and how much of it will come back on the snagging list. Four things answer that.

  • Fixer, taper or both. These are different skills and different rates. If you can do both, say so; if you are strictly a fixer, say that too rather than getting taken on for a taping gang and struggling.
  • Production rate. Boards per day, flats per day, m² per week. A number tells a foreman where to put you in the gang. Say the board size you are counting, because 2400 x 1200 and 3000 x 1200 are not the same day's work.
  • Commercial or residential. Metal stud, MF ceilings, fire-rated partitions and shaft walls are commercial work. Timber stud, dot-and-dab and small patches are residential. Say which you have done and how recently.
  • Cards and access. CSCS card, IPAF for scissor and boom lifts, PASMA, silica awareness. On a commercial site these decide whether you get through induction on day one.

“Tell me your board count and whether you fix, finish or both. Then tell me you have run a lift and read a fire-rated detail. Everything else is a bonus. What I never learn from most CVs is whether the guy can board a ceiling, and that is half the job on commercial work.”

Recruiter panel, Interior finishes construction hiring manager, US (name published after review)

Dry liner personal statement and career objective examples

Three or four lines. Years, commercial or residential, fixing or finishing, a production number and your cards. Career objectives only for labourers and apprentices.

Commercial fixer and finisher
Dry liner with 11 years on commercial and residential schemes, fixing metal-stud partitions, shaft walls and ceilings and taping and jointing to a paint-ready finish. Fixes 45 to 55 boards (2400 x 1200 mm) on a standard wall day and reads fire-rated system details from the drawings. CSCS Blue card, IPAF trained, own tools and van.
Residential and new-build fixer
Dry lining fixer with 6 years on new-build houses and flats, averaging one two-bedroom flat boarded per two-person day. Comfortable on timber and metal stud, dot-and-dab, moisture-resistant board, cement board and 15 mm fire-rated ceilings. CSCS Blue card and a clean working-at-height record.
Taper and jointer
Taper and jointer with 9 years finishing to paint-ready and skimmed standards, including critical-lighting lobbies and hospital corridors. Runs automatic tools (bazooka, flat boxes, angle head) and hand-finishes repairs and making good. Averages 370 to 460 m² of first coat a day with the tools.
Foreman
Dry lining foreman with 13 years, currently running gangs of 4 to 9 on commercial fit-outs from 1,900 to 16,700 m². Does material take-offs from drawings, holds waste under 6%, and passed the fire-stopping inspection first time on 9 of the last 10 projects. CSCS Gold card and SSSTS.
Career objective, labourer or apprentice
Construction labourer seeking a dry lining role with a path to fixer. Two years loading out, cutting and screwing board on office fit-outs, comfortable carrying full boards and working off podium steps and towers. CSCS Green card held and reliable transport to any West Midlands site.

Dry liner job description for a CV: weak vs. strong bullets

The left column is what almost every dry liner CV says. The right column is what makes a foreman pick up the phone.

WeakStrong
Fixed plasterboard on commercial buildings.Fixed 45 to 55 boards (2400 x 1200 mm) a day on metal-stud partitions across projects from 1,900 to 16,700 m², including a 6-storey medical centre fit-out.
Taped and jointed walls.Taped and jointed to a paint-ready finish on standard walls and a skimmed finish in critical-lighting lobbies; dry lining snagging items dropped from 40 to 12 across the last three projects.
Read drawings.Built 2-hour shaft walls and deflection heads to the manufacturer's tested details and passed the fire-stopping inspection first time on 9 of 10 jobs.
Used tools to finish faster.Ran bazooka, flat boxes and angle head on repeat flat layouts, cutting finishing time per flat by about a day and a half.
Boarded ceilings.Fixed 25 to 30 boards a day on ceilings and bulkheads off scissor lifts and mobile towers, and installed suspended ceiling grid and tile behind it.
Ordered materials.Took off board, screws, beads and compound floor by floor from the drawings and held material waste under 6% against an 8% allowance.
Followed safety rules.Worked 3 years with no working-at-height breaches off podium steps, mobile towers and 6 m scissor lifts, and used extracted sanders to control dust.
Supervised other workers.Led a gang of 4, set the daily board count, checked screw centres and board joints before taping, and trained two labourers up to fixer in 18 months.

Useful numbers: boards per day and board size, m² per week, flats per day on housing, finish standard, snagging items, waste percentage, gang size, days without an incident. If you never counted, count next week and use that.

Start with an example, finish in minutes.

No sign-up needed to start. Pick an example, adapt it with suggestions and preview it as you go.

Build my dry liner CV

Skills to put on a dry liner CV

Name materials, systems and tools. "Hard worker" costs you a line and buys nothing.

  • Board types: 12.5 mm and 15 mm standard, fire-rated, moisture-resistant, mould-resistant, impact-resistant, cement board, acoustic boards
  • Framing and setting out: metal stud and track, timber stud, deflection heads, furring, MF ceilings, pattresses for grab rails and units, chalk line and laser setting out
  • Systems: shaft wall, separating wall, fire-rated and acoustic partitions, bulkheads, dot-and-dab wall lining
  • Finishing: taping and jointing, second and third coat, sanding, paint-ready and skimmed finishes, angle and stop beads, shadow gap trims, patch repairs and making good
  • Tools: screw gun, router, board lifter, bazooka and automatic taping tools, flat boxes, angle head, board saw, rasp, extracted sander
  • Access: scissor lift, boom lift, podium steps and mobile towers, stilts where permitted
  • Paperwork: drawing and system detail reading, material take-offs, day sheets, snagging lists

Worth listing separately if true: dust control in occupied buildings, work in hospitals and clean areas, insurance repair work, and Polish, Romanian or another language alongside English, which matters on mixed gangs.

Dry liner CV with no experience

Dry lining gangs take on labourers constantly. A labourer loads out board, cuts, screws, mixes compound and cleans up, and learns to fix inside a year if they stay. What a foreman wants to see is that you will turn up and that you can carry a full board.

  1. 1Get a CSCS Green Labourer card. It needs the CITB Health, Safety and Environment test and a Level 1 health and safety award, and most contractors will not put you on site without it.
  2. 2Say plainly that you can lift and carry: a 2400 x 1200 mm sheet of 15 mm board weighs roughly 30 kg, fire and acoustic boards more, and two-person carries are the whole first month.
  3. 3List any hand-tool or trade work you have done, even unpaid: building a shed, patching walls, painting, tiling, working on a farm or in a warehouse.
  4. 4Give your transport and your start time. Dry lining gangs start early and move between sites; "own van, can be on any West Midlands site by 7am" is a real advantage.
  5. 5If an apprenticeship interests you, look for dry lining or interior systems apprenticeships with local contractors, colleges and training providers, and say you have applied.
Transferable bullet from warehouse or removals work
Loaded and moved 60 to 90 items a shift weighing up to 25 kg, with no lifting injuries reported over 2 years.
Transferable bullet from any construction site
Worked as a general labourer on housing sites for 18 months: site clean-up, loading out materials to upper floors, and strip-out with dust control in place.

Cards, training and apprenticeships

  • CSCS card. Green Labourer card for labourers, Blue Skilled Worker card once you hold an NVQ Level 2, Gold for supervisors. Most main contractors will not let you through induction without one.
  • IPAF for scissor (3a) and boom (3b) MEWPs, plus familiarisation on the specific machine on site.
  • Silica dust awareness, because cutting and sanding create fine dust that must be controlled under COSHH, with a face-fit test for any tight-fitting mask.
  • PASMA for mobile towers and working at height training. Say if you have SSSTS for supervising a gang.
  • A telehandler or forklift card (CPCS, NPORS or an accredited forklift certificate) if you move board around a site.
  • Emergency First Aid at Work (1 day).
  • Qualifications and apprenticeships: an NVQ Level 2 in interior systems or dry lining, gained through an apprenticeship or an on-site assessment route, and manufacturer training from British Gypsum, Siniat or Knauf. If you completed or started one, name the provider and the years.
Do not invent a card. Site managers check CSCS cards at induction, often by scanning them, and an unverifiable card gets you sent home on the first morning. If a card has expired, write "CSCS Blue, renewal booked January 2027" instead.

CV format and length

  • One page. Dry lining work is judged on the last three or four jobs.
  • Header: trade (fixer, taper or both), CSCS card, whether you have tools and a van, and how far you will travel.
  • Reverse-chronological with month and year. Contract work comes and goes, so a one-line reason for a gap ("contract finished, gang moved on") beats silence.
  • If you have worked for many contractors, group the short ones under one heading and list the projects underneath by name, size and your role.
  • No photo, no date of birth, no full address (town is enough). Use the advert's words: dry liner, drylining fixer, partition fixer, plasterboard fixer or taper and jointer. In Scotland the SVQ takes the place of the NVQ.
  • PDF unless the contractor asks for something else. Many subcontractors read CVs sent by WhatsApp or text, so keep the type large enough to read on a phone.

Frequently asked questions

How do I write a dry liner CV?

Start with three lines saying whether you fix, finish or both, how many years you have, the kind of work (commercial, flats, housing) and your board count per day. List jobs in reverse order with month and year and three to five bullets each. Put your CSCS card near the top. Keep it to one page.

What is the dry liner job description for a CV?

Measuring and cutting board, setting out and building metal-stud partitions and MF ceilings, fixing walls and ceilings at the correct screw centres, building fire-rated and shaft wall systems, taping and jointing to the specified finish, fitting beads and trims, patching and making good, and cleaning up with dust control.

How many boards should I say I fix a day?

Say what you really do and name the board size. On commercial metal-stud partitions with 2400 x 1200 mm board, 40 to 60 boards a day is a strong single-fixer number; ceilings cut that roughly in half. On housing, gangs often measure in plots or m² instead. An honest range beats a round number you cannot repeat.

What skills should I put on a dry liner CV?

Board types including 15 mm fire-rated and moisture-resistant, metal stud framing, MF ceilings, shaft wall and fire-rated partition systems, taping and jointing to a paint-ready finish, automatic taping tools, beads and trims, making good, suspended ceiling grid, scissor and boom lifts, drawing reading and material take-offs.

Do I need qualifications to be a dry liner?

No licence is needed to work as a dry liner in the UK, but most major sites require a CSCS card, and the Blue Skilled Worker card needs an NVQ Level 2 or a finished apprenticeship. IPAF, PASMA and silica awareness are expected on commercial work, and manufacturer training from firms such as British Gypsum or Siniat is worth listing.

How do I get a dry lining job with no experience?

Apply as a labourer. Get your CSCS Green card first, say clearly that you can carry 30 kg boards in a two-person lift, list any physical or trade work you have done, and give your transport and start time. Gangs start early and move between sites, so reliability is what is being tested in the first month.

Should a dry liner CV be one page or two?

One page for fixers and tapers. A foreman or supervisor with a long project list can use a second page, but only for a project list: name, size, your role and the finish standard. Anything older than about ten years goes to one line.

Ready to write yours?

The builder suggests a summary from your own experience, then checks it against the job posting.