Plasterer Resume Examples & Writing Guide
A plasterer resume gets a call back when the contractor can see what you can hang and finish in a day: square feet of three-coat stucco, veneer plaster or EIFS, the finishes you can hand-texture, lath and scaffold work, your callback record and an OSHA card. One page, plain layout. Journeyman stucco, drywall finisher and helper examples below.
Plasterer resume example (journeyman, stucco and interior plaster)
A one-page resume for a journeyman plasterer with nine years in the trade, four of them as a union apprentice. Name and companies are made up. Every job gives square footage, the systems installed (three-coat stucco, EIFS, veneer plaster), crew size and a callback or inspection record, which is exactly what a plastering or stucco contractor reads for.
Ramon Castellanos
Journeyman Plasterer · Stucco, EIFS and Veneer Plaster
Phoenix, AZ · (602) 555-0171 · ramon.castellanos@email.com · Valid Arizona driver's license · Own hand tools and hawk and trowel set
Summary
Journeyman plasterer with 9 years on residential and light-commercial jobs in the Phoenix area, including a 4-year OPCMIA apprenticeship. Runs a 4-person crew applying three-coat stucco, one-coat systems and EIFS on new tract homes, custom homes and retail shells; averages 2,000 sq ft of brown coat a day and hand-finishes 800 to 1,000 sq ft of texture a day. Callback rate under 1% on 140+ homes since 2022. OSHA 30, zero recordable injuries.
Experience
Lead Plasterer / Crew Lead · Sonoran Stucco & Plaster (residential and light-commercial stucco contractor, 45 field staff), Phoenix, AZ
Sep 2021 – Present
- Lead a 4-person crew on 3 to 4 new tract homes a week (2,200 to 3,400 sq ft each): paper and lath, weep screed and control joints, scratch and brown coats, then color-coat or acrylic finish.
- Average 2,000 sq ft of brown coat a day with a plaster pump and 800 to 1,000 sq ft of hand-applied finish (sand, Santa Barbara smooth, dash and lace textures).
- 140+ homes completed since 2022 with a callback rate under 1%; cracking complaints cut in half after changing control-joint spacing and brown-coat moist-curing on hot days.
- Installed 38,000 sq ft of EIFS (drainage-type system with base coat, mesh and acrylic finish) on two retail strip centers and a medical office building; all three passed third-party inspection with no rework.
- Passed 100% of city lath inspections first time on 60+ permitted jobs by checking flashing, weep screed height and lath fastening before calling the inspector.
- Zero recordable injuries for the crew in 4 years; run scaffold checks each morning and enforce wet-cutting and respirator use under the OSHA silica standard.
Apprentice Plasterer, then Journeyman (OPCMIA registered apprenticeship) · Desert Ridge Plastering (custom-home and commercial plastering contractor), Scottsdale, AZ
Mar 2017 – Aug 2021
- Completed a 4-year, 6,000-hour registered apprenticeship with 576 classroom hours; turned out as a journeyman in 2021.
- Applied veneer plaster over blueboard in 45 custom homes (about 180,000 sq ft of wall and ceiling), including Level 5 smooth finish for high-end interiors.
- Mixed and hand-applied lime and gypsum plaster for ornamental repair on a 1920s downtown theater restoration: 400 linear ft of cornice and 30 ceiling medallions patched and matched.
- Set up and tore down frame scaffold to 30 ft on 20+ commercial jobs; scaffold competent-person trained in year two.
- Operated the plaster pump and mixer for the crew for 3 years; kept the mixer and hoses running through 300+ pours with no downtime charged to equipment.
Education
Plasterer Apprenticeship Certificate (4 years, OPCMIA Local, registered with the US Department of Labor)
Arizona Plasterers and Cement Masons Training Center, 2021
High School Diploma
Maryvale High School, Phoenix, AZ, 2016
Certifications
- OSHA 30-Hour Construction Safety and Health (Outreach Training Program), 2022
- Scaffold competent person training (OSHA 29 CFR 1926 Subpart L), 2019
- Respirable crystalline silica awareness training (OSHA 1926.1153), 2020
- Manufacturer EIFS installer training (two major EIFS systems), 2022
- Scissor lift and aerial lift operator training (ANSI A92), 2023
- First Aid/CPR/AED, American Red Cross, current
Skills
What plastering and stucco contractors look for
Your resume is read by the owner or the field superintendent of a plastering shop, often on a phone between jobs. They want four things answered in a glance.
- What you can do in a day. Square feet of brown coat, finish coat, EIFS or veneer plaster; homes per week for tract work. Production is how they bid, so a plasterer who knows his own numbers is worth an interview.
- Which systems and finishes. Three-coat stucco, one-coat, EIFS, veneer plaster, ornamental and lime work, drywall Level 5. Name them. A tract stucco crew and a historic restoration shop hire completely different people.
- Callbacks and inspections. Cracking, delamination and failed lath inspections cost the contractor money and reputation. A stated callback rate and a first-time inspection record answer the question before it is asked.
- Apprenticeship, safety and logistics. OPCMIA or non-union apprenticeship hours, OSHA 10 or 30, scaffold and silica training, a driver's license, own hand tools, and whether you can run a pump or a crew.
“I want to know how many square feet of brown coat you can put up with a pump crew and whether your finish work comes back. If someone writes 'under 1% callbacks on 140 houses', I know they lay it right and they cure it right.”
Plasterer job description for a resume: duties turned into strong bullets
The typical plasterer job description reads: apply coats of plaster or stucco to interior and exterior surfaces, install lath and accessories, mix materials, set up scaffolding, follow safety rules. Those are the duties. On your resume, each one needs a size, a system and a result.
| Weak (job description copied) | Strong (square footage, system, result) |
|---|---|
| Applied plaster and stucco to exterior walls. | Applied three-coat stucco on 3 to 4 new homes a week (2,200 to 3,400 sq ft each) with a 4-person pump crew, averaging 2,000 sq ft of brown coat a day. |
| Installed lath and accessories. | Installed paper-backed metal lath, weep screed, casing bead and control joints on 60+ permitted homes; 100% passed city lath inspection on the first visit. |
| Applied finish coats and textures. | Hand-finished 800 to 1,000 sq ft a day of sand, Santa Barbara smooth and lace textures; matched existing textures on 30+ remodel additions with no visible seams. |
| Installed EIFS. | Installed 38,000 sq ft of drainage-type EIFS (base coat, mesh, acrylic finish) on two retail centers and a medical office; passed third-party inspection with no rework. |
| Did interior plastering. | Applied veneer plaster over blueboard in 45 custom homes, about 180,000 sq ft, including Level 5 smooth finish in living areas and hand-troweled skip-trowel in the rest. |
| Performed plaster repair and restoration. | Patched and matched 400 linear ft of run cornice and 30 ceiling medallions in lime and gypsum plaster on a 1920s theater restoration under a preservation architect's review. |
| Mixed materials and operated equipment. | Ran the plaster pump, mixer and hopper gun for a 5-person crew for 3 years, mixing to specified ratios; 300+ pours with zero downtime charged to equipment. |
| Followed safety procedures. | Zero recordable injuries for a 4-person crew in 4 years; daily scaffold inspections and wet-cutting and respirator use under the OSHA silica standard. |
Skills for a plasterer resume
List 10 to 14 skills a superintendent could put you on a wall to demonstrate. Group them by system so the reader can match you to their work.
- Exterior stucco: paper and lath, weep screed and accessories, scratch and brown coats, moist curing, cement and acrylic finish coats, one-coat systems, control-joint layout.
- EIFS: substrate prep, adhesive and mechanical attachment of insulation board, base coat and mesh embedment, drainage plane details, sealant joints, manufacturer specifications.
- Interior plaster: veneer plaster over blueboard, two-coat gypsum plaster, Level 5 smooth, textured finishes (skip trowel, knockdown, orange peel), Venetian and lime plaster.
- Ornamental and restoration: running moldings in place, casting and installing medallions and cornices, patching historic lime plaster, matching old textures.
- Drywall finishing where the shop does both: taping, bedding, coating, sanding, Level 4 and 5 finishes, corner bead, automatic taping tools.
- Equipment: plaster pumps and mixers, hopper guns and spray rigs, scaffold and scissor lifts, hawk and trowel, darby, floats, feather edges.
- Reading plans: elevations, wall sections, joint and reveal layout, flashing and window details; talking with framers, window installers and inspectors about sequence.
- Safety and site habits: OSHA 10 or 30, silica wet methods and respirators, fall protection and scaffold rules, heat illness prevention on exterior work, clean-up and protection of finished surfaces.
Start with an example, finish in minutes.
No sign-up to start. Download works. One-time $12 for a clean PDF, no subscription.
Apprenticeship, OSHA and other lines contractors want to see
Plastering has no state license in the US (contractors hold a contractor license; the plasterer does not). What proves your training is a completed apprenticeship, hours in the trade and safety cards. Write them plainly and give the years.
Journeyman Plasterer, OPCMIA registered apprenticeship (4 years, 6,000 on-the-job hours, 576 classroom hours), completed 2021
Plasterer Apprentice, 3rd year, 4,200 of 6,000 hours documented, OPCMIA Local training center; scaffold user and silica awareness training complete
9 years in stucco and plaster with two contractors, from hod carrier to crew lead; production and callback figures on request from both employers
OSHA 30 Construction (2022) · Scaffold competent person (2019) · Silica awareness (2020) · Aerial and scissor lift (ANSI A92, 2023) · First Aid/CPR/AED (current)
- Required by most commercial general contractors: OSHA 10 at minimum, OSHA 30 for crew leads; scaffold training for anyone working from frame scaffold; silica awareness since the OSHA respirable crystalline silica rule applies to mixing and cutting.
- Strong plus: manufacturer training for the EIFS system the contractor installs, aerial lift and forklift cards, a driver's license clean enough to drive the company truck and pump trailer, bilingual English and Spanish on many crews.
- Do not write "OSHA certified". There is no such certification; it is a 10-hour or 30-hour Outreach Training card. Give the hours and the year.
Drywall finisher and taper resume: what to change
Many people searching for a plasterer resume actually work as drywall finishers (tapers) and many shops do both. The resume follows the same rules with different numbers: boards hung or square feet taped per day, finish levels, tools and the punch-list record.
Drywall finisher with 7 years on commercial and multifamily jobs. Tapes and finishes 2,500 to 3,000 sq ft a day to Level 4 with automatic tools (bazooka, boxes, angle heads), Level 5 skim on lobbies and corridors. Led finishing on a 220-unit apartment complex with a punch list under 2 items per unit. OSHA 30, scissor lift certified.
Finished 220 apartment units (about 480,000 sq ft of board) over 11 months with a 3-person crew, Level 4 throughout and Level 5 in corridors; average punch list under 2 items per unit at turnover.
Hung 60 to 80 sheets of 5/8-inch board a day on metal framing with a partner and finished the same walls the following week; zero failed fire-rated assembly inspections on 14 commercial jobs.
Plasterer helper or apprentice resume with no experience
Stucco and plastering crews hire helpers (hod carriers, tenders, laborers) constantly, and apprenticeship programs take people with no trade background. They hire for four things: you show up at 5 a.m. in the summer, you can carry 80-pound bags all day, you follow instructions on a scaffold, and you want to learn the trade. Prove those with specifics.
- 1Header: name, phone, email, city, then a line of practical facts: driver's license and reliable transportation, OSHA 10 if you have it, available for early starts and Saturdays, bilingual if true.
- 2Objective: two lines naming the role (plasterer helper, apprentice, tender) and what you bring (labor experience, a pre-apprenticeship course, military service, any masonry or concrete work).
- 3Work history: every job that proves physical work and reliability, with numbers. Landscaping, concrete, roofing, warehouse, farm work, moving. Give months without a missed shift, weights lifted, crew size, hours per week.
- 4Skills: mixing mortar or concrete, using a wheelbarrow and mixer, setting up ladders or scaffold, reading a tape measure, cleaning tools, basic Spanish or English for the crew. One page, no photo; many shops still hire in person, so bring printed copies.
Construction laborer with 2 years on concrete and masonry crews (mixing, tending, scaffold setup, 55-hour weeks in summer) and a current OSHA 10 card. Seeking a plasterer helper or apprentice position with a stucco contractor; ready to enter the OPCMIA apprenticeship.
Laborer, residential concrete contractor, 2024 to 2026. Mixed and wheeled 40+ bags of mix a day, set and stripped forms, kept tools and the mixer clean, and did not miss a shift in 22 months. Trained on frame scaffold in year one.
Format, length and keywords (plus the UK plasterer CV)
- One page. Even a 20-year plasterer fits: header, summary, experience with square footage, skills by system, apprenticeship and safety lines. Two pages only for a superintendent or estimator with a long project list.
- Plain layout, single column, standard font, no photo, no date of birth. Small plastering shops print it or read it on a phone; large drywall and EIFS subcontractors and general contractors use applicant tracking systems that read plain text best.
- Save as a text-based PDF named Firstname-Lastname-Plasterer.pdf, or Word if the posting asks.
- Keywords to mirror from the posting: "stucco", "three-coat", "EIFS", "lath", "veneer plaster", "drywall finishing", "Level 5", "scaffold", "OSHA 30", "plaster pump", "residential", "commercial", "crew lead", "bilingual".
- In the UK, Ireland and Australia the job is far more common as a distinct trade, the document is a plasterer CV, and employers look for an NVQ Level 2 or 3 in Plastering, a CSCS card, and skimming, rendering, dry lining and floor screeding experience with square meterage rather than square footage. The production and callback numbers matter just the same.
Run the finished page through the cvplex ATS checker with the posting pasted in. It flags bullets with no square footage or result, a system the posting names that you left out, and a missing safety-card line.
Frequently asked questions
What is a plasterer's job description for a resume?
In plain terms: install lath and accessories, mix and apply base and finish coats of stucco or plaster, install EIFS or veneer plaster, texture and repair surfaces, set up scaffold and follow safety rules. On the resume, turn each duty into a bullet with square footage, the system and a result such as inspections passed or callbacks under 1%.
How do I write a plasterer resume with no experience?
Apply as a helper or apprentice. Show reliability and physical readiness with numbers from any labor job (months without a missed shift, bags carried, crew size), list your driver's license, OSHA 10 and early-start availability in the header, and write a two-line objective naming the role and the apprenticeship you want to enter. One page.
What skills should I put on a plasterer resume?
Ten to fourteen a superintendent could test: three-coat stucco and lath, EIFS, veneer plaster and Level 5 finish, hand textures, ornamental repair if you do it, plaster pump and mixer operation, scaffold setup, reading elevations and wall sections, OSHA silica and fall-protection practices. Group them by system.
Do plasterers need a license or certification?
No state licenses a plasterer as an individual in the US; the contractor holds the license. What counts is a completed apprenticeship (OPCMIA or another registered program), documented hours, OSHA 10 or 30, scaffold and silica training, and manufacturer training for EIFS systems. Say "check the contractor licensing rules in your state" if you plan to work for yourself.
Can I use a plasterer resume for drywall finishing jobs?
Yes, with different numbers. Give square feet taped and finished per day, finish levels (Level 4, Level 5), the tools you run (automatic taper, boxes, angle heads), units or floors completed and your punch-list record. Many shops hire for both, so list stucco and drywall skills in separate groups.
How long should a plasterer resume be?
One page. Contractors decide in seconds based on the systems you name, your daily production and your callback record. Only an estimator, superintendent or restoration specialist with a long project list needs a second page.
Ready to write yours?
The builder suggests a summary from your own experience, then checks it against the job posting.
How this page was made: a first draft was written with AI assistance from cvplex's example library, then edited and fact-checked by the cvplex Careers Team. Examples are fictional composites; numbers are illustrative. Report an error via the editorial policy page.