Sheet Metal Worker CV Examples & Writing Guide
A sheet metal worker CV gets a call when the foreman can see which side you work (workshop fabrication, site installation, architectural or service), the machines you run, the thicknesses and materials you handle, and whether you welded, brazed or only fastened. Apprenticeship status, NVQ level and CSCS card come next.
Sheet metal worker CV example (workshop fabrication and site installation)
This is a CV for a qualified sheet metal worker with fourteen years, split between workshop fabrication and ventilation ductwork installation. The name and companies are made up. Every job entry names the machines and the material, because that is what a workshop foreman reads for.
Ray Sandoval
Sheet Metal Worker, NVQ Level 3 (Fabrication and Installation)
Birmingham · 07700 900193 · r.sandoval.metal@email.com · CSCS card (skilled worker) · SSSTS · Full UK driving licence
Summary
Sheet metal worker with 14 years, including a completed 4-year apprenticeship. Fabricates and installs ventilation and air conditioning ductwork in 0.5 to 1.6 mm galvanised steel, stainless and aluminium, and runs guillotine, press brake, CNC plasma table, Pittsburgh lock former and slip rolls. Reads M&E drawings and develops patterns by triangulation and radial line. Coded welder to BS EN ISO 9606-1 on sheet steel and stainless, SSSTS trained, with a 1.4% workshop scrap rate over three years.
Experience
Sheet Metal Worker (workshop and site, commercial building services) · Ironclad Building Services (commercial ventilation and air conditioning, 140 staff), Birmingham
Aug 2019 – Present
- Fabricate and install rectangular and circular ductwork for commercial jobs using 2 to 40 tonnes of galvanised steel per project, built to DW/144 at low and medium pressure classes.
- Run the workshop's CNC plasma table, 3 m guillotine, 4 m press brake and Pittsburgh lock former, averaging 1,200 to 1,550 kg of ductwork fabricated per shift.
- Install hangers, trapeze supports, fire dampers, VAV boxes and grilles on 3 to 8 storey commercial buildings, working from M&E drawings and site-measured sketches.
- Held workshop scrap at 1.4% of material issued over three years by nesting on the plasma table and checking flat pattern developments before cutting.
- Welded stainless kitchen extract canopies and grease ductwork with TIG and MIG, passing a third-party weld inspection on 3 of 3 projects since 2023.
- Led a 4-person crew on a 28-tonne hospital ductwork package delivered 2 weeks early with zero failures on the leakage test.
- Trained 5 apprentices on press brake bending sequence, hem and lock allowances and safe guillotine operation.
Sheet Metal Fabricator (workshop) · Cascade Metalworks (bespoke fabrication shop, 22 staff), Walsall
Jun 2016 – Aug 2019
- Fabricated bespoke parts in 0.5 to 3 mm galvanised, stainless, aluminium and cold-rolled steel from workshop drawings and customer samples.
- Developed flat patterns by parallel line, radial line and triangulation for transitions, offsets, cones and tapered fittings.
- Operated turret punch, press brake with 8 tooling set-ups, slip rolls, box and pan folder, spot welder and beading machine.
- Cut first-pass rework on a repeat electrical enclosure job from 11% to 3% by building a fixture and a written set-up sheet for the press brake.
- Kept an average of 18 to 24 workshop orders moving at once and hit the promised dispatch date on 94% of them across three years.
Sheet Metal Apprentice (4-year Advanced Apprenticeship) · Cascade Metalworks with day release to a further education college, Walsall
Sep 2012 – Jun 2016
- Completed roughly 8,000 hours of on-the-job training plus 4 years of day-release college study in layout, welding, technical drawing and ductwork specifications.
- Rotated through workshop fabrication, site installation, architectural flashings and service work.
- Passed the CITB health, safety and environment test in the first year and the MIG/MAG and TIG welding units in year three.
- Completed the apprenticeship in June 2016 with NVQ Level 3 and distinctions in the college units on layout and drawing.
Education
Advanced Apprenticeship (Level 3), sheet metal fabrication and ductwork, 4 years (completed, NVQ Level 3)
Further education college (day release), Walsall, 2016
A-levels in Maths and Design and Technology
Sixth form college, Walsall, 2012
Certifications
- CSCS card (skilled worker), current
- Coded welder to BS EN ISO 9606-1, MAG (135) and TIG (141) on sheet steel and stainless, kept current
- SSSTS (Site Supervisors' Safety Training Scheme), 2023
- Fire and smoke damper installation training (manufacturer course), 2018
- IPAF PAL card, scissor (3a) and boom (3b), 2024; counterbalance forklift (accredited course), 2024
- Silica dust awareness and RPE face-fit test, 2025
- Emergency First Aid at Work, 2025
Skills
What a workshop foreman or site supervisor checks first
This trade splits into several jobs that share one title. The person reading your CV already knows which one they are filling, and they are checking whether you match it.
- Which side of the trade. Workshop fabrication, site installation, architectural sheet metal (roofing, flashings, cladding panels), service and duct cleaning, or industrial and food equipment. Say it plainly.
- Machines you have actually run, with sizes: a 3 m guillotine, a 4 m press brake, a CNC plasma table, a Pittsburgh lock former, a turret punch. "Operated workshop machinery" tells a foreman nothing.
- Materials and thicknesses. 0.5 mm galvanised ductwork and 3 mm stainless food equipment need different hands. Give the range you have worked in millimetres, and add the gauge if the advert uses it.
- Whether you weld, and on what. MIG/MAG, TIG, spot welding, brazing, on steel, stainless or aluminium. A coded welder on stainless is worth noticeably more in this trade.
- Layout ability. Anyone can bend a part off a printed pattern. Developing a transition by triangulation from an M&E drawing is what separates a qualified sheet metal worker from a fabricator's mate.
- Apprenticeship status and cards. Whether you completed an apprenticeship, which year you finished, your NVQ level and which CSCS card you carry.
“I get CVs that say fabricated and installed sheet metal products. That could be a duct shop or a roofing crew. Tell me the machines, the gauges, whether you weld stainless and whether you can lay out a transition, and I know within ten seconds if you fit my opening.”
Machines, materials and layout: the section that makes the difference
Add a short block near the top called Equipment and Materials. It is unusual on a CV and it works, because it lets a foreman match you to the vacancy without reading the whole page.
Machines: 3 m guillotine, 4 m press brake (8 tooling set-ups), box and pan folder, slip rolls, turret punch, CNC plasma table with nesting, Pittsburgh lock former, roll former, notcher, beading machine, spot welder. Materials: 0.5 to 3 mm galvanised, 304 and 316 stainless, 3003 and 5052 aluminium, cold-rolled steel.
Site: rectangular and circular ductwork installation to DW/144 low and medium pressure classes, hangers and trapeze supports, fire and smoke dampers, VAV boxes, grilles and diffusers, flexible connections, ductwork leakage testing. Tools: hand seamers, crimpers, SDS drill, scissor and boom MEWPs, laser level, plasma cutter.
Pattern development: parallel line, radial line and triangulation for transitions, offsets, cones and tapered fittings; hem, lock and bend allowance calculations; site measuring and sketching for one-off fittings.
AutoCAD, Autodesk Fabrication CADmep and CAMduct for ductwork take-off and nesting, plus reading Revit-produced M&E drawings and workshop job cards.
Sheet metal worker personal statement and career objective examples
Three or four lines. Side of the trade, years, machines, materials, welding and apprenticeship status. Use a career objective only if you are applying for an apprenticeship or coming in from another trade.
Sheet metal worker with 14 years and a completed 4-year apprenticeship (NVQ Level 3), working both workshop fabrication and commercial ductwork installation. Runs guillotine, press brake, CNC plasma and Pittsburgh lock former in 0.5 to 3 mm galvanised, stainless and aluminium. Coded welder on sheet steel and stainless, SSSTS trained, and held workshop scrap to 1.4% over three years.
Sheet metal fabricator with 8 years in a 22-person bespoke fabrication shop, building enclosures, chutes, hoods and one-off parts in 0.5 to 3 mm. Develops flat patterns by triangulation and radial line, sets up a 2.5 m press brake from scratch and runs a turret punch. Cut rework on a repeat enclosure job from 11% to 3% with a fixture and a written set-up sheet.
Architectural sheet metal worker with 11 years on standing seam roofing, cladding panels, copings, flashings and gutters in copper, zinc, aluminium and PVDF-coated steel. Folds and solders on site, works from elevation drawings, and has run 4-person crews on 6 school and council projects. SSSTS trained, with working at height and harness inspection training.
Looking for a first-year sheet metal or ductwork apprenticeship. Two years running a press brake and guillotine at a small jobbing shop in 0.8 to 1.6 mm steel, plus school Design and Technology and a short welding course. Holds a full UK driving licence and reliable transport, and is ready for the maths and mechanical aptitude test.
Start with an example, finish in minutes.
No sign-up needed to start. Pick an example, adapt it with suggestions and preview it as you go.
Sheet metal job description for a CV: weak against strong
The weakest sheet metal bullets read like a dictionary entry: cut, formed and installed sheet metal products. Put the machine, the material, the volume and the result into every line.
| Weak (duty only) | Strong (machine, material, volume, result) |
|---|---|
| Cut, formed and assembled sheet metal parts. | Fabricated rectangular and circular ductwork on a 3 m guillotine, 4 m press brake and Pittsburgh lock former, averaging 1,200 to 1,550 kg of galvanised steel per shift. |
| Read drawings and made parts to specification. | Developed flat patterns by triangulation and radial line for transitions, offsets and cones from M&E drawings, checking bend and lock allowances before cutting. |
| Installed ductwork in commercial buildings. | Installed ductwork, hangers, trapeze supports, fire dampers and VAV boxes on 3 to 8 storey commercial buildings, on jobs using 2 to 40 tonnes of galvanised steel. |
| Welded parts as needed. | Welded stainless kitchen extract canopies and grease ductwork with TIG and MIG, passing third-party weld inspection on 3 of 3 projects since 2023. |
| Reduced waste in the workshop. | Held scrap at 1.4% of material issued over three years by nesting on the plasma table and checking developments before cutting. |
| Worked as part of a crew. | Led a 4-person crew on a 28-tonne hospital ductwork package, delivered 2 weeks early with no failures on the leakage test. |
| Set up machines for production runs. | Cut first-pass rework on a repeat enclosure job from 11% to 3% by building a bending fixture and writing a set-up sheet for the 2.5 m press brake. |
| Trained less experienced workers. | Trained 5 apprentices on press brake bending sequence, hem and lock allowances and safe guillotine operation, including two who have since completed their apprenticeships. |
Sheet metal worker skills for a CV
Group them into machines, materials, layout, joining and site work. A grouped list lets a foreman match you to a specific vacancy in a couple of seconds.
- Machines: guillotine, press brake, box and pan folder, slip and pinch rolls, turret punch, CNC plasma or laser table, Pittsburgh lock former, roll former, notcher, beader, hydraulic press, English wheel if you have done custom body or architectural work.
- Joining: MIG/MAG, TIG, spot welding, soft soldering for architectural copper and gutters, brazing, riveting, self-drilling fasteners, sealants and mastic, drive cleats and S-slips.
- Layout and drawing: parallel line, radial line and triangulation pattern development, bend and hem allowances, workshop and M&E drawing reading, site measuring, isometric sketching, AutoCAD and Autodesk Fabrication.
- Materials: galvanised steel from 0.5 to 3 mm, stainless 304 and 316, aluminium, copper, zinc, cold-rolled steel, PVDF-coated panel stock, insulation and duct liner.
- Site skills: hangers and trapeze supports, fire and smoke dampers, VAV boxes, grilles and diffusers, ductwork leakage and pressure testing, air balance basics, working from MEWPs, coordination with pipefitters and electricians in tight ceiling voids.
- Safety and equipment: CSCS card and site safety training, working at height, RPE face-fit and silica awareness, hearing and eye protection, forklift and MEWPs (IPAF), slinging and material handling, isolation and lock-off.
- Soft skills worth stating specifically: turning up for a 6 am workshop start, keeping a snagging list clean, and telling the foreman that a fitting will not fit before you install it.
Apprentice and entry level: a sheet metal CV with no experience
Most people enter this trade through an apprenticeship with a ductwork contractor or fabrication firm, with day release to college. Those applications look at maths, mechanical aptitude, attendance and whether you can pass a medical and a drugs and alcohol test more than at a polished CV.
- 1Pass the CITB health, safety and environment test before you apply. It is cheap, takes under an hour and removes the easiest reason to pass you over.
- 2Lead with anything that shows hand skills, measurement and machines: school Design and Technology or engineering, welding courses, vehicle bodywork, farm work, small engine repair, a jobbing shop, Armed Forces maintenance work.
- 3Say your maths level plainly. Apprenticeship aptitude tests cover fractions, decimals, area and basic geometry, so a line such as "GCSE Maths grade 6, comfortable with fractions, decimals and measuring to the millimetre" helps.
- 4Add a full UK driving licence, reliable transport and the ability to lift 25 to 35 kg repeatedly. All three get asked about.
- 5If you have workshop time already, name the machines and the thicknesses even if the volume was small. Two years on a press brake in 0.8 mm steel is real experience.
- 6One page. No photo, no date of birth. Apply for advertised apprenticeships and to ductwork and fabrication contractors directly at the same time; both take on trainees and labourers.
Completed GCSE Design and Technology and a school engineering workshop course: hand tools, guillotine and folder work in 0.6 to 1 mm steel, oxy-acetylene cutting and an introduction to MIG welding; built a final-project sheet metal toolbox from my own flat pattern.
Worked 2 years at a 6-person jobbing shop running a 1.25 m guillotine and box and pan folder in 0.8 to 1.6 mm steel and aluminium, deburring and assembling 30 to 60 parts a day with no missed shifts.
Worked 3 years as a warehouse and delivery hand lifting 25 to 35 kg repeatedly on 5 am starts, with a 100% attendance record and a clean driving licence since 2021.
Format, length and keywords to mirror
Two pages at most. One is enough for most hands; use two if you have run crews on large building services projects and need a project list. One column, standard headings, no photo, no graphics. Save as PDF unless the contractor's portal asks for Word.
- Order: contact details, personal statement, equipment and materials block, experience, skills, certificates and cards, apprenticeship and education.
- Mirror the advert: sheet metal worker, fabricator, ductwork, DW/144, press brake, guillotine, plasma, Pittsburgh, galvanised, stainless, TIG, MIG, spot weld, layout, triangulation, drawings, hangers, dampers, VAV, NVQ Level 3, apprentice, CSCS.
- Add a short project list if you do commercial work: building type, tonnage of ductwork, crew size, year. Contracts managers read it as a track record.
- Cover gaps between contracts with a line such as "end of contract, re-engaged by the same contractor" rather than leaving a gap.
- UK conventions: no photo, no date of birth, no marital status. Name your NVQ level, the year you finished your apprenticeship and the colour of your CSCS card.
- File name: ray-sandoval-sheet-metal-worker-cv.pdf.
The older term for this trade is tinsmith, and US contractors still ask for a resume rather than a CV. In the UK the job is usually advertised as sheet metal worker, sheet metal fabricator or ductwork fabricator or installer, so use the advert's own title in your headline and add tinsmith only if the advert uses it.
Frequently asked questions
What should a sheet metal worker put on a CV?
Which side of the trade you work (workshop, site, architectural or service), the machines you run with their sizes, the thicknesses and materials you handle, whether you weld and on what, and your apprenticeship and NVQ status. Add volume numbers such as kilos fabricated per shift and scrap rate, plus your CSCS card and safety training.
How do I write a sheet metal job description for my CV?
Do not copy the advert. Write the machine, the material, the volume and the outcome in each line: "Fabricated ductwork on a 3 m guillotine, 4 m press brake and Pittsburgh lock former, averaging 1,200 to 1,550 kg of galvanised steel per shift." Five or six bullets per job is enough.
What skills should a sheet metal worker list on a CV?
Machines (guillotine, press brake, slip rolls, turret punch, CNC plasma, lock former), joining (MIG, TIG, spot welding, soldering, riveting), layout (parallel line, radial line, triangulation, bend allowances), materials by thickness, and site work such as hangers, dampers, VAV boxes and leakage testing.
What is a good career objective for a sheet metal worker CV?
Use one only if you are applying for an apprenticeship or moving in from another trade. Name the apprenticeship or role, list any machine time and thicknesses you already have, state your driving licence and any CSCS card or safety test, and say you are ready for the maths aptitude test. Three sentences.
How do I get into sheet metal work with no experience?
Apply for apprenticeships with ductwork contractors and fabrication firms, and for labouring or workshop assistant jobs at the same time. Pass the CITB health, safety and environment test first. Lead with school Design and Technology, engineering or welding courses, any machine time, your maths level, a driving licence and the ability to lift 25 to 35 kg repeatedly.
Should I list my welding certificates on a sheet metal CV?
Yes, and be specific. Name the process (MIG/MAG, TIG, spot), the materials (sheet steel, stainless, aluminium) and the standard you were coded to, such as BS EN ISO 9606-1. A coded welder on stainless is worth more in this trade, particularly for kitchen extract canopies and grease ductwork.
How long should a sheet metal worker CV be?
One page for most hands, two at most. Use two only if you lead crews and want a project list with building types, tonnage and crew sizes. Keep the equipment and materials block in the top third so a workshop foreman can match you to the vacancy without reading the whole page.
Ready to write yours?
The builder suggests a summary from your own experience, then checks it against the job posting.
How this page was made: a first draft was written with AI assistance from cvplex's example library, then edited and fact-checked by the cvplex Careers Team. Examples are fictional composites; numbers are illustrative. Report an error via the editorial policy page.