Print Finisher CV Examples & Writing Guide

A print finisher CV gets read when the machines are on it: guillotine, folder, stitcher, binder, laminator, and the makes you have run. Add make-ready times, sheets or books per hour, spoilage rate and a clean safety record, and a finishing supervisor can slot you into a shift immediately.

By cvplex Careers Team· Reviewed by József Dorcsinecz, Founder· Updated

Print finisher CV example (finishing department, 8 years)

One page, written for a finishing supervisor who is trying to cover a shift. The name and companies are invented. The run speeds, make-ready times and spoilage figures are the kind of numbers on your own job tickets.

Teodor Vlasic

Print Finisher / Bindery Operator

Leeds · 07700 900193 · teodor.vlasic.finishing@email.com

Summary

Print finisher with 8 years in commercial print finishing. Sets up and runs a Polar 137 guillotine, a Stahl buckle folder and a Muller Martini saddle stitcher, and holds spoilage under 1.5% on runs up to 120,000 sheets. Cut average folder make-ready from 45 to 28 minutes by building a setup card library. Eight years with no lost-time injury on guarded equipment.

Experience

Senior Print Finisher · Commercial sheetfed printer (90 staff), Leeds

Feb 2022 - Present

  • Set up and run a Polar 137 programmable guillotine, a Stahl 66 cm buckle folder and a 6-pocket Muller Martini saddle stitcher across a 10-hour late shift.
  • Run stitched booklet work at 7,500 to 9,000 books an hour with spoilage held under 1.5% on runs up to 120,000 sheets.
  • Cut average folder make-ready from 45 to 28 minutes by building a setup card library for the 40 most common fold patterns.
  • Schedule and sequence 15 to 20 jobs a shift against press finish times, and flag imposition or grain problems back to prepress before a run starts.
  • Train and sign off 4 new operators on guillotine safety, two-hand controls and knife changes; all 4 passed the company's machine competency sign-off.
  • Run laminating, drilling, padding, scoring and shrink wrapping as job mix requires, plus hand finishing on short-run jobs.

Print Finisher · Short-run digital and litho printer, Bradford

Jun 2019 - Jan 2022

  • Operated a perfect binder and a wire-o punch and closer for manuals and catalogues, averaging 1,100 books an hour on the binder.
  • Ran a 76 cm thermal laminator on covers, keeping delamination complaints to 2 jobs in 3 years by controlling roller temperature and dwell.
  • Cut and trimmed on a 115 cm guillotine, including step cuts and gang cuts on business card work, 40 to 60 lifts a shift.
  • Kept the shift's on-time delivery at 97% across roughly 2,600 jobs, coordinating with despatch on cut-off times.

Finishing Assistant · Short-run digital and litho printer, Bradford

Oct 2018 - May 2019

  • Jogged, banded, boxed and palletised finished work, and hand-collated short runs of up to 2,000 sets.
  • Loaded and unloaded pallets with a pallet truck and kept the finishing floor clear and swept.

Education

GCSEs and A-levels
Sixth form college, Bradford, 2018

Print finishing short course (part-time)
Further education college, Leeds, 2021

Certifications

  • Counterbalance forklift certificate, RTITB accredited (2022, refresher kept current)
  • IOSH Working Safely (2023)
  • Isolation and lockout and machine guarding (PUWER) training (2024)
  • Emergency First Aid at Work (2025)

Skills

Programmable guillotine (Polar), knife changesBuckle and knife folders (Stahl, MBO)Saddle stitching (Muller Martini)Perfect binding and wire-oThermal and UV laminatingDie cutting, scoring, creasing, perforatingDrilling, padding, numbering, bandingShrink wrapping and palletisingJob ticket reading and imposition awarenessMake-ready and setup card buildingPUWER machine guarding, two-hand controls, isolation and lockoutPallet truck and counterbalance forklift
Fictional example. Names, employers and numbers are illustrative.Use this example in the builder →
In the UK and Ireland this job is usually advertised as print finisher or finishing operator, and sometimes as bindery operator. In the US the same work is posted as bindery operator. Use the title from the advert in your headline, and if you trained abroad, keep the original title in your history if that is what your reference will confirm.

The machine list is the CV

A finishing supervisor is doing one thing when they read your page: matching your machines to the floor. Write makes and models, not categories, and say whether you set up or only run.

What most people writeWhat gets you a call
Experienced with cutting equipment.Polar 137 programmable guillotine: full setup, program entry, knife and stick changes, 40 to 60 lifts a shift.
Operated folding machines.Stahl 66 cm buckle folder with 4 plates and a right-angle unit; set up 40 fold patterns from setup cards, 28-minute average make-ready.
Worked on a booklet line.6-pocket Muller Martini saddle stitcher with cover feeder and three-knife trimmer, running 7,500 to 9,000 books an hour.
Familiar with binding.Perfect binder (EVA hot melt) for manuals and catalogues at about 1,100 books an hour, plus wire-o punch and closer.
Used laminating machines.76 cm thermal laminator on covers; controlled roller temperature and dwell, 2 delamination complaints in 3 years.
Other finishing duties.Die cutting, scoring, perforating, drilling, padding, numbering, banding, shrink wrapping and hand assembly on short runs.
If you have run a machine only as a second operator, say so. Overstating setup ability gets found out on day one, when someone hands you a job ticket and a fold dummy.

What a finishing supervisor checks first

  • Setup ability. Running a machine somebody else set up is an assistant's job. Make-ready time is the number that separates the two, so put yours on the page.
  • Spoilage and rework. Finishing is where a whole press run gets destroyed in ten seconds. A spoilage percentage tells a supervisor how careful you are.
  • Safety habits on a guillotine. Two-hand controls, guard checks, knife changes, isolation and lockout under PUWER. Six years with no lost-time injury is a hiring argument, not a throwaway line.
  • Shift and overtime willingness. Finishing is the end of the line, so it absorbs every delay upstream. Late shift and night shift openings are the most common ones.
  • Job ticket literacy: reading imposition, grain direction, fold dummies, trim marks and finished size, and catching a problem before 60,000 sheets go through the folder.

“Makes and models, then make-ready time, then spoilage. That is all I need. Someone who tells me they took a folder make-ready from 45 minutes to 28 has thought about the job, and I can put them on a machine the first week instead of the second month.”

Recruiter panel, Print finishing and bindery hiring manager, US (name published after review)

Print finisher CV personal statement examples

Experienced print finisher
Print finisher with 8 years in commercial print finishing. Sets up and runs a Polar guillotine, a Stahl buckle folder and a Muller Martini saddle stitcher, holds spoilage under 1.5% on runs up to 120,000 sheets, and cut folder make-ready from 45 to 28 minutes. No lost-time injury in 8 years.
Guillotine and cutting specialist
Guillotine operator with 8 years on programmable guillotines up to 137 cm. Handles gang cuts, step cuts and short-grain stock, changes knives and cutting sticks without a service call, and runs 50 to 70 lifts a shift with under 1% spoilage.
Laminating and coating focus
Finishing operator with 5 years on thermal and UV laminating and coating lines. Runs B2 and B1 laminators on covers and point-of-sale work, controls temperature, tension and dwell for gloss, matt and soft-touch films, and keeps rework under 2%.
Packaging and die cutting
Finishing operator with 4 years on a platen die cutter and a folder gluer for folding cartons. Sets up rules and make-ready sheets, strips and separates, and holds waste under 3% on runs of 40,000 to 250,000 cartons.
First finishing job
Reliable worker seeking an entry-level finishing assistant role on a late shift. Two years of warehouse and packing work with 3 missed days, comfortable standing a 10-hour shift and lifting 23 kg, and holds a current forklift certificate. Willing to start as an assistant and train on machines.

Start with an example, finish in minutes.

No sign-up needed to start. Pick an example, adapt it with suggestions and preview it as you go.

Build my print finisher CV

Finishing bullets: weak to strong

WeakStrong
Operated finishing equipment.Set up and ran a Polar 137 guillotine, a Stahl folder and a 6-pocket stitcher across a 10-hour late shift, 15 to 20 jobs a shift.
Reduced setup times.Built a setup card library for the 40 most common fold patterns, cutting average folder make-ready from 45 to 28 minutes.
Maintained quality standards.Held spoilage under 1.5% on runs up to 120,000 sheets by checking fold registration and trim size every 500 sheets.
Followed safety procedures.Ran guarded equipment with two-hand controls and isolation and lockout for every knife change; 8 years with no lost-time injury.
Helped with scheduling.Sequenced finishing work against press finish times so the shift hit 97% on-time delivery across roughly 2,600 jobs.
Trained other employees.Trained and signed off 4 new operators on guillotine safety, program entry and knife changes; all 4 passed the company competency check.
Worked with the prepress department.Flagged imposition and grain problems back to prepress before runs started, catching 6 jobs in 2025 that would have folded against the grain.
Packed finished jobs.Banded, shrink wrapped and palletised finished work to customer count and label spec, with no despatch count errors in 18 months.

Safety training and certificates worth listing

  • Forklift certificate. There is no national forklift licence in the UK: you hold a certificate from an accredited trainer (RTITB, ITSSAR, AITT or NPORS) and each employer authorises you for its own site, so a certificate from a previous employer still counts. Give the year and the truck type.
  • IOSH Working Safely. Short, common in manufacturing and easy to verify.
  • Isolation and lockout and machine guarding training (PUWER), which matters more in a finishing department than almost anywhere else in a print works, because of the guillotine.
  • Any manufacturer training you received on a specific machine, such as a folder or stitcher course run by the supplier during an install.
  • Emergency First Aid at Work or First Aid at Work, and any fire marshal or emergency response role.
  • Your injury record, if it is clean. 'No lost-time injury in 8 years on guarded equipment' is a legitimate line on a finishing CV.

Print finishing CV with no experience

Most print finishers started as finishing assistants, jogging and banding, and learned machines from the person beside them. Write your CV for that opening rather than for an operator seat.

  1. 1Ask for the finishing assistant role by name in your career objective, and say which shift you want. Late shift and night shift openings come up most often.
  2. 2Put attendance on the page with a number. In a print works that runs to a despatch cut-off, turning up is the whole first test.
  3. 3List physical work you have already done: warehouse, packing, kitchen, removals, assembly line. Say the shift length and the weight you handled.
  4. 4List any machine or vehicle you can already run, including a forklift, pallet truck or floor scrubber.
  5. 5Mention hand skills: assembly work, hand collating, folding, packing to count. Finishing still does plenty by hand on short runs.
  6. 6Keep it to one page, and bring a printed copy. Smaller printers hire from people who call in more than from job boards.
Entry-level career objective
Seeking an entry-level finishing assistant role on a late shift, with a goal of training onto a guillotine or folder. Two years of warehouse packing with 3 missed days, comfortable lifting 23 kg through a 10-hour shift, and holding a forklift certificate since 2025.
Transferable bullet
Packed and palletised 300 to 400 cases a shift in a distribution centre, working to count and label accuracy standards with 2 count errors in 14 months.

Format and applying

  • One page. Two only if you have supervised a department.
  • Single column, PDF, plain headings. No photo, no date of birth and no marital status on a UK CV.
  • Put a machine list block near the top, before your job history. It is the fastest way for a supervisor to decide about you.
  • Mirror the job advert's words for the applicant tracking system: print finishing, finisher, saddle stitch, perfect bind, guillotine, laminate, die cut, make-ready.
  • Name the shift you want and whether you can work overtime. Finishing runs long when the press runs late.
  • If your experience is from the US, where the job is usually called bindery operator, keep that title in your history and add 'print finisher' in brackets once, so a UK reader recognises the work.

Frequently asked questions

What does a print finisher do?

Everything that happens to printed sheets after the press: cutting, folding, stitching, binding, laminating, die cutting, drilling, padding, packing and palletising. In the UK the job is advertised as print finisher, finishing operator or sometimes bindery operator, so search all three titles when you apply.

What should I put on a print finisher CV?

Machines by make and model, whether you set them up or run them, your make-ready times, run speeds, spoilage rate and safety record. Add job ticket literacy, forklift and health and safety training, and the shift you can work. Keep it to one page.

What skills does a print finisher need?

Machine setup and make-ready, knife changes, fold pattern setup, stitching and binding, laminating, reading job tickets and fold dummies, grain direction awareness, quality checks, safe operation of guarded equipment, and pallet truck or forklift work.

Can I get a print finishing job with no experience?

Yes. Most printers hire finishing assistants to jog, band, box and palletise, then train them onto machines. Show reliable attendance, physical stamina, any forklift certificate and your availability for late shifts or nights, and ask for the assistant role directly.

How do I show I can set up machines, not just run them?

Give make-ready times and setup detail. Writing 'set up 40 fold patterns from setup cards, 28-minute average make-ready' proves it; 'operated folding machines' does not. Mention knife and cutting stick changes, program entry and any supplier training on a specific machine.

How long should a print finisher CV be?

One page. Supervisors read these quickly, often while covering a shift, so put the machine list and your shift availability in the top third of the page.

Ready to write yours?

The builder suggests a summary from your own experience, then checks it against the job posting.

How this page was made: a first draft was written with AI assistance from cvplex's example library, then edited and fact-checked by the cvplex Careers Team. Examples are fictional composites; numbers are illustrative. Report an error via the editorial policy page.