Floor Layer CV Examples & Writing Guide
A floor layer CV gets the call when a contractor can see exactly which materials you fit, whether you do your own subfloor prep and moisture testing, how many square metres you turn out in a day, your call-back record, and the tools and van you bring. One page, no photo.
Floor layer CV example (commercial and residential, 10 years)
One page for a lead floor layer with ten years across commercial and residential work. The person and the companies are invented. Notice that the materials are named at the top, that subfloor prep and moisture testing get their own bullets, and that square metres appear in almost every line.
Eddie Marchetti
Lead Floor Layer · LVT, Safety Vinyl, Carpet, Wood, Tile
Nottingham · 07700 900184 · eddie.marchetti@email.com · Own van, full hand and power tool set · Full UK driving licence, clean
Summary
Lead floor layer with 10 years in commercial and residential work: LVT, safety vinyl and sheet vinyl with hot-welded seams, broadloom and carpet tiles, engineered and solid wood, laminate and ceramic tiles. Does his own subfloor prep, moisture testing and smoothing. Averages 85 to 120 m² of LVT a day on his own and runs gangs of 3. Under 1% call-backs over 4 years.
Experience
Lead Floor Layer · Commercial flooring contractor (schools, GP surgeries and offices), Nottingham
Mar 2021 – Present
- Lead gangs of 2 to 3 on commercial jobs from 280 to 4,200 m², including a 4,200 m² academy school and 11 GP surgery and clinic fit-outs.
- Fit LVT, carpet tiles, broadloom, safety vinyl with hot-welded seams and coved skirting, vinyl tiles and rubber stair nosings to manufacturer specification.
- Run hygrometer and in-situ RH tests to BS 8203 on every screed before adhesive goes down, and log the results for the main contractor; no adhesive failure on any job in 5 years.
- Grind, patch and apply smoothing compound on out-of-tolerance screeds, including 575 m² of a clinic floor that was 20 mm out over 3 m.
- Lay 85 to 120 m² of glue-down LVT a day working alone, and about 280 m² with a 3-person gang.
- Call-back rate under 1% across roughly 120 completed jobs, and every snagging list closed within 5 working days.
Floor Fitter · Residential refurbishment and void property contractor, Derby
Jun 2018 – Mar 2021
- Turned round 3 to 5 void flats a week (55 to 100 m² each) in carpet, LVT and sheet vinyl, working to a same-day handover schedule.
- Laid and refinished solid and engineered wood floors on 40+ residential jobs, including sanding and finishing 260 m² of white oak with a water-based lacquer.
- Stretch-fitted broadloom carpet with a power stretcher in rooms up to 85 m², fixed gripper and seamed with a seaming iron and hot-melt tape, with no visible seams flagged at inspection.
- Set out and laid ceramic and porcelain floor tiles and wet room floors in 25+ bathrooms, including diagonal and herringbone patterns.
- Kept material waste under 6% on roll goods by dry-laying and planning seams before cutting.
Flooring Fitter's Mate · Flooring retailer's fitting team (residential and light commercial), Nottingham
Aug 2016 – Jun 2018
- Stripped out and cleared 18,500+ m² of old carpet, vinyl and tiles over two years, including scraping and preparing screeds for new floor coverings.
- Loaded, delivered and acclimatised material on 6 to 10 jobs a week, and kept the van stocked with blades, adhesive, trowels and threshold strips.
- Learned setting out, seaming, gripper and click and glue-down LVT from two lead fitters, then ran small jobs on my own by year two.
Education
NVQ Level 2 in floorcovering (on-site assessment route), 2020; A-levels, 2016
Training provider, Nottingham; sixth form college, Derby, 2020
Certifications
- CSCS Blue Skilled Worker card, renewed 2025
- Silica dust awareness and RPE face-fit test, 2024
- UKATA Asbestos Awareness, renewed 2025
- Manufacturer installation training: two major safety flooring and LVT adhesive systems
- Emergency First Aid at Work, renewed 2025
Skills
What a flooring contractor checks first
Flooring is price work across much of the UK, so the person hiring you is doing sums: how many square metres can this fitter put down in a day, and how often will somebody have to go back?
- Materials. Carpet, vinyl and LVT, wood and tile are close to four separate trades. A contractor with a commercial LVT package does not care how good your sanding and finishing is. Name every material you fit, and be honest about the ones you have only helped with.
- Prep. Fitters who grind, patch, lay smoothing compound and run moisture tests are worth more, because adhesive failure on a damp screed is the most expensive call-back in the business.
- Production rate. Square metres per day, by material, working alone and in a gang. If you have never counted, count for a week before you write the CV.
- Call-backs and snagging. A call-back rate or a plain sentence such as "no adhesive or seam failure in 5 years" is stronger than any adjective.
- Tools, van and paperwork. Own tools, a van that carries material, a clean driving licence, and whether you work PAYE or self-employed under CIS on price work. Say which, because it changes the offer.
“The first thing I look for is whether they do their own prep. Anybody can lay plank on a flat, dry slab. The installers who test moisture, grind the high spots and tell me before they glue are the ones who never cost me a tear-out, and I will pay a better rate to keep them.”
How to list the materials you fit
This is the section most floor layer CVs skip, and it is the one that decides the call. Use a short block near the top, grouped by material, and mark your level honestly.
Resilient: LVT (glue-down, click, loose-lay), safety vinyl and sheet vinyl with hot-welded seams and coved skirting, vinyl tiles, rubber. Textiles: broadloom (power stretch and glue-down), carpet tiles. Wood: engineered and solid, secret-nailed, glued and floating; sanding and finishing. Hard: ceramic and porcelain floor tiles, wet room floors. Laminate, cork, stair nosings and threshold strips.
Wood floor specialist: solid and engineered, secret-nailed, glued and floating; sanding and finishing with belt and edging sanders and a buffer; water-based lacquers and hardwax oils; stair treads, risers and nosings; herringbone and chevron; repairs and board replacement on existing floors.
Main: LVT, safety vinyl, sheet vinyl, carpet tiles. Secondary (worked as second fitter): broadloom stretch-fit, ceramic tile. Not currently doing: sanding and finishing, terrazzo, resin.
Prep: screed grinding, shot blasting, patching, smoothing compound, surface DPMs, plywood overlay on timber floors, hygrometer and in-situ RH testing to BS 8203.
Floor layer personal statement and career objective examples
Three lines: years, materials, prep, production rate and one quality number.
Lead floor layer with 10 years in commercial and residential work: LVT, safety vinyl with hot-welded seams, carpet and carpet tiles, wood and ceramic. Does his own grinding, smoothing and moisture testing. Averages 85 to 120 m² of glue-down LVT a day and runs gangs of 3. Under 1% call-backs over 4 years.
Commercial floor layer with 7 years on schools, hospitals and offices. Fits carpet tiles, LVT, safety vinyl with welded seams and coved skirting, vinyl tiles and rubber, working nights and in phases around occupied areas. Comfortable with product data sheets, moisture test records and main contractor snagging lists.
Carpet and vinyl fitter with 12 years in residential and void property work. Power stretching, seaming, gripper, pattern matching and stair carpets. Turns round 3 to 5 void flats a week on a same-day handover schedule with material waste under 6%.
Looking for a flooring fitter's mate role with a firm that trains. Two years of strip-out and general labouring, comfortable on my knees all day, own hand tools and reliable transport. CSCS Green card held. Aim is to be fitting LVT and carpet on my own within two years.
Start with an example, finish in minutes.
No sign-up needed to start. Pick an example, adapt it with suggestions and preview it as you go.
Work bullets: weak versus strong
A flooring bullet should say the material, the square metres, the condition of what you were laying over, and how it turned out.
| Weak | Strong |
|---|---|
| Laid various types of flooring. | Laid 4,200 m² of carpet tiles and LVT in an academy school over 7 weeks, phased around occupied classrooms. |
| Prepared subfloors. | Ground, patched and applied smoothing compound to 575 m² of clinic screed that was 20 mm out over 3 m, before any flooring went down. |
| Followed manufacturer instructions. | Ran hygrometer RH tests to BS 8203 on every screed and logged the results for the main contractor; no adhesive failure on any job in 5 years. |
| Fitted carpet in flats. | Turned round 3 to 5 void flats a week (55 to 100 m² each) in carpet, LVT and sheet vinyl for a same-day handover schedule. |
| Worked with wood floors. | Sanded and finished 260 m² of white oak with a water-based lacquer, three coats, with no swirl marks or lap lines at final inspection. |
| Cut and fitted materials. | Kept roll-goods waste under 6% by dry-laying and planning seams before cutting, on jobs averaging 140 m². |
| Trained new employees. | Trained 4 fitter's mates on setting out, seaming and glue-down LVT; two now run their own jobs. |
| Maintained a good safety record. | Used extracted grinders and RPE on every dusty task under COSHH; no injuries or dust complaints in 10 years. |
Qualifications and cards worth listing
There is no licence to lay floors in the UK, but a few cards and qualifications get you onto commercial sites and into manufacturer-backed work. If you plan to work for yourself, sort out public liability insurance and register as self-employed before your first job.
- A CSCS card is the entry card for most commercial sites: Green Labourer for fitter's mates, Blue Skilled Worker once you hold an NVQ Level 2, Gold for supervisors.
- Silica dust awareness matters because grinding screeds and cutting tiles and boards creates fine dust that has to be controlled under COSHH, and main contractors ask about it.
- Asbestos awareness is close to essential on refurbishment work. Older thermoplastic and vinyl floor tiles and black bitumen adhesive can contain asbestos, and anyone liable to disturb asbestos at work needs awareness training. If you suspect it, stop and report it.
- Trade qualifications and bodies: an NVQ Level 2 in floorcovering (through an apprenticeship or on-site assessment), courses from the Flooring Industry Training Association (FITA), and the Contract Flooring Association (CFA) for firms on commercial work. List the exact qualification and year.
- Manufacturer installation training on specific safety flooring, LVT, adhesive or wood systems is worth a line, because it protects the warranty on the job.
- First aid, an IPAF or forklift card, and a clean driving licence all belong in one compact line.
No experience: the flooring fitter's mate CV
Flooring firms take on fitter's mates for attitude, knees and reliability. Nobody expects setting-out skill from a first-year mate. Build the page around evidence that you will turn up at 7 and still be working at 4.
- 1Header with your phone, town, driving licence and whether you have your own transport and hand tools.
- 2A two-line career objective naming the fitter's mate role and what you want to be doing in two years.
- 3Your CSCS Green card if you have it, or the date your CITB HS&E test is booked.
- 4Physical work history with numbers: strip-out, landscaping, removals, warehouse, kitchens. Hours per shift, weights handled, attendance record.
- 5Any hands-on skill that transfers: measuring and cutting, using a mitre or table saw, tiling or decorating you did at home, knowing your way around a tape measure and a chalk line.
- 6One line about what you know about the trade, so it does not look like you picked flooring at random.
Did strip-out work in a 3-person gang for 18 months, 10-hour days, carrying 25 to 40 kg of debris per load to the skip and averaging 4 house strip-outs a week, with 1 sick day in 18 months.
Laid 37 m² of click LVT and 11 m² of ceramic tile in a family rental flat, including underlay, threshold strips and scotia beading, working from manufacturer instructions.
Own van and full hand tool set including knee pads, chalk line, tape, carpet knives and an undercut saw. Available from 6 am and able to travel up to 90 minutes for jobs out of town.
Format, length and the words to use
- One page, plain, no photo. Print copies as well, because a lot of flooring hiring happens at the trade counter or on site.
- Put materials and prep in the top third. A contractor reading on a phone in the van rarely scrolls.
- Give square metres, material and job type in bullets rather than adjectives. Numbers do the persuading.
- Say whether you work PAYE or self-employed under CIS, and whether you have your own tools, van and public liability insurance.
- Mirror the advert's words: LVT, safety flooring, sheet vinyl, glue-down, floating, hot weld, coved skirting, carpet tiles, gripper, power stretch, smoothing compound, DPM, moisture test, snagging, take-off.
- In the UK and Ireland the job is advertised as floor layer, floor fitter, flooring installer or carpet fitter. Use the advert's title; the document is a CV either way.
Frequently asked questions
What should I put in a flooring job description on a CV?
Write what you actually laid, not a generic duty list: the materials, the square metres, the subfloor prep you did, the tools you ran and how the job finished. For example, "laid 4,200 m² of carpet tiles and LVT in an occupied school over 7 weeks, phased by wing, with zero snagging items at final inspection".
What skills should a floor layer put on a CV?
Split them by material and by prep. Materials: LVT, safety and sheet vinyl with hot welding, broadloom and carpet tiles, wood floors including sanding and finishing, laminate, ceramic tiles. Prep: grinding, patching, smoothing compound, moisture testing. Then tools (track saw, floor grinder, hot-air welder, power stretcher, undercut saw), setting out and seam planning, and drawing reading if you do commercial work.
How do I get a flooring job with no experience?
Apply as a fitter's mate and build the CV around reliability and physical work. Put your transport, tools and CSCS card in the header, then work history with hours, weights and attendance figures. Add any flooring or carpentry done at home. Most floor layers in the UK started as mates or apprentices and learned on the job, so firms expect this application.
How long should a floor layer CV be?
One page. Contractors scan for materials, production rate and call-backs and rarely read further. If you have twenty years, group the older jobs into one line and keep the recent detail.
Do I need a qualification to lay floors?
There is no licence to lay floors in the UK, but a CSCS card is expected on commercial sites, silica awareness is commonly asked about, and asbestos awareness matters before you lift old floor coverings. An NVQ Level 2 in floorcovering, FITA courses and manufacturer training help on bigger commercial and warranty work. If you work for yourself, sort out public liability insurance and your tax registration first.
Should I list how many square metres I can lay per day?
Yes, by material and whether you are alone or in a gang. Flooring is priced by the square metre, so a production rate is the number a contractor is trying to work out anyway. Give a realistic range, such as 85 to 120 m² of glue-down LVT on your own, and be ready to prove it on the first job.
Ready to write yours?
The builder suggests a summary from your own experience, then checks it against the job posting.
How this page was made: a first draft was written with AI assistance from cvplex's example library, then edited and fact-checked by the cvplex Careers Team. Examples are fictional composites; numbers are illustrative. Report an error via the editorial policy page.